BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 12, 2026

Site work and paving for a road / highway in Brimfield, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Bituminous Concrete Excavation Cold Planer - Brookfield and Monson Road. The work to be done consists of excavating bituminous concrete pavement by means of Cold Planer in designated areas. The Cold Planer shall be at least 72" wide and capable of planing both bituminous pavements and cement patches if the latter are found in bituminous pavements. The Cold Planer must be equipped with an elevating device capable of loading planed material directly into dump trucks while operative and with all necessary safety devices, such as reflectors, headlights, taillights, flashing lights, and back-up signals to operate safety in traffic with complete safety. The milled or planed surface shall not be torn, gouged, shoved, broken or excessively grooved. It shall be free of imperfections in workmanship that prevent resurfacing after this operation. Surface texture shall be as specified by the Highway Surveyor and excess material shall be removed so that the surface is acceptable to traffic if required. The Contractor shall be compensated based on the final surface area regardless of the number of passes required to achieve the final depth or grade. The price per square yard shall include full compensation for all labor, including lowering ofmanhole covers, grates, catch basin covers, water gates, and other structures in the roadway, if necessary, equipment, tools and other incidentals necessary but not limited to these provisions for the satisfactory completion ofthe work as required by the Highway Surveyor. Estimated 35,000 SY Cold Planing, 2500 GAL Asphalt Emulsion, 3000 TON Super Pave 9.5mm, and 50 TON Asphalt Driveway Aprons & Waterways for Monson Road/Brookfield Road Chapter 90 Project. The Select Board reserves the right to reject any and/or all bids, or, accept that bid deemed to be in the best interest of the Town of Brimfield. The total cost of project(s) is estimated to be $583,598.55. Minority percentage rate must not be less than 5%. Duration ofthe bid contract is July 1, 2026 through June 30, 2027; otherwise, please state on bid sheet any exceptions.

Post-Bid

Roads / Highways

$583,599.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
933
Active Projects
541
Bidding Soon
6,142
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2026

July 1, 2026

Project location map

Multiple Locations, Brimfield, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.