Site work for a communication facility in Prineville, Oregon. Completed plans call for site work for a communication facility.

The City of Prineville is seeking bids for the installation of underground fiber optic infrastructure from the existing Millican Well House to the Millican corridor, then to the ASR #2 Well and Pump Station, continuing to the Heliport 4 Well and Pump Station and the Heliport tank monitoring facility. The project consists of furnishing all labor, equipment, materials, supplies, incidentals, and appurtenances necessary to construct a complete fiber optic pathway and communication connection to the ASR #2, Heliport 4, and Heliport tank facilities. The work includes but is not limited to the installation of HDPE conduit, fiber optic cable, vaults, building entry components, and related appurtenances. Installation methods may include directional boring, trenching, and plowing, depending on location, subsurface conditions, and field constraints. Work also includes installation through anticipated rock areas, connection to existing duct or vault infrastructure where shown or directed, installation of new vaults, fiber placement, testing, cleanup, and restoration of disturbed areas. PROJECT LOCATION The project is located in Crook County, Oregon. The conduit installation portion of the project includes two primary segments. The first segment begins at the Millican Well House and extends to the Millican roadway corridor within an existing 30-foot City right-of-way. Along the Millican roadway corridor, the work shall remain within the City right-of-way, which extends approximately 50 feet west from the centerline of Millican Highway to the intersection of Millican Highway and Highway 126. This segment primarily includes conduit installation, required appurtenances, and placement of single-mode fiber optic cable. The second segment continues the single-mode fiber optic cable installation to the ASR #2 Well and Pump Station, then to the Heliport 4 Well and Pump Station and the Heliport tank monitoring facility. Start Date (Notice to Proceed) no sooner than August 3, 2026 Completion Date October 2, 2026 Deadline for ITB Questions or Protests or Requests for Changes June 16, 2026 @ 4:00 PM -- All questions regarding this project solicitation shall be directed to Randy Blakeney, Assistant City Engineer, in writing to rblakeney@cityofprineville.com.

Sub-Bidding

Communication

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
11
Bidding Soon
143
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2026

August 3, 2026

Project location map

Multiple Locations, Prineville, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.