BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 31, 2026 at 8:00 PM

Updated June 1, 2026

Demolition and site work for a water / sewer project in Farmington, Minnesota. Completed plans call for site work for a water / sewer project.

The work involves underground utility improvements to the stormwater, sanitary sewer, drain tile, and domestic water systems at the Minneapolis ARTCC (ZMP) in Farmington, MN as depicted in the contract drawings and specifications. Contractors must coordinate with FAA representatives to verify utility records, locate existing underground utilities, implement erosion and sediment control, maintain safety measures, and perform all confined space work as per OSHA requirements. The scope includes vacuum excavation, dewatering and shoring systems, demolition of specified facilities and utility infrastructure, removal of concrete foundations and pavements, and trench excavation for new systems. New work encompasses replacing and installing sanitary sewer, stormwater, and water system components, constructing new lift stations, integrating electrical power and controls, and connecting to the Building Automation System (BAS). Site restoration includes repairing disturbed pavements, landscaping, ADA walkways, and installing new fencing and gates. Contractors must furnish all materials, equipment, and labor, maintain orderly completion of work, and restore all areas to original condition upon project completion. Damage to FAA property due to contractor actions must be repaired at the contractor's expense. The sequence of work may be altered as necessary by the contractor to meet project requirements. QUESTIONS DUE BY 5:00PM CENTRAL TIME, THURSDAY, JUNE 16, 2026 Question Deadline 06/16/2026 at 5:00 PM CT-All questions must be in writing and emailed to the Contracting Officer (Richard.L.Palsgrove@faa.gov and the Contract Specialist (Karen.V-CTR.Czerwiec@faa.gov. No phone calls will be returned regarding RFP. SCOPE: IIJA Underground Utility Improvements to the Stormwater, Sanitary Sewer, Drain Tile, and Domestic Water Systems at the Minneapolis ARTCC (ZMP) in Farmington, Minnesota, as shown on the Contract Drawings and specified herein. The work includes, but is not limited to, the following: 1. General: a. Coordinate with FAA representatives to obtain and verify existing utility record drawings prior to excavation. b. Locate all existing underground utilities in advance of construction activities. c. Implement and maintain erosion and sediment control measures in accordance with the Soil Erosion and Sediment Control Plans (C118). d. Install and maintain construction safety fencing, access controls, and phasing per the Access Route and Phasing Plan (G104). e. Perform all confined space work in accordance with OSHA 29 CFR 1910.146 and 1926.21(b)(6). f. Coordinate with FAA engineers for details if stockpiling and disposal of excavated material is required. 2. Demolition/Excavation: a. Vacuum excavation shall be utilized for the first 8 feet of any excavation and 2 feet below any existing utility. b. Contractor shall design and implement dewatering and shoring systems required to protect excavations and adjacent facilities. c. Existing stormwater lines shall not be broken or tied into until associated inlets and manholes are installed. Provide temporary pumps and power as necessary to remove water from basins to complete construction. Temporary pump discharge may be directed to the nearest downstream manhole as shown on the drawings. d. Demolish the following facilities and associated utilities as shown on Drawings D101-D109: i) Sanitary Lift Station ii) Storm Lift Station (Courtyard) iii) Admin Wing and Cafeteria Expansion Drain Tile Lift Station iv) Cooling Tower Pump House e. Remove existing concrete foundations, slabs, vaults, and abandoned utility infrastructure per Structural Drawings S001-S004. f. Perform trench excavation for new storm sewer, sanitary sewer, drain tile, and water systems per C101-C110. g. Selectively demolish pavements, curbs, sidewalks, and hardscape within project limits. h. Demolition, abandonment, and removal of existing sanitary sewer piping and structures as shown on the plans. 3. New Work: Furnish all labor, materials, equipment, and coordination necessary to construct the underground utility improvements as shown on the Contract Drawings and Specifications, including but not limited to the following: a. Sanitary Sewer Improvements: i) Replace Sanitary Sewer Lines #1, #2, and #3, including interior basement routing and exterior piping, per Drawings C104, C106, and C108. ii) Abandon and remove existing sanitary piping and structures where indicated. iii) Install new precast concrete sanitary manholes, cleanouts, and reconnections at existing tie-in points. iv) Construct a new Sanitary Lift Station including wet well, duplex submersible pumps, guide rail systems, discharge piping, valves, controls, and venting per P007, S104, and E104. b. Stormwater Improvements: i) Install new Storm Sewer Lines #1 through #7 per C101-C107. ii) Furnish and install new storm manholes, curb inlets, catch basins, and drainage structures per C114-C116. iii) Reconstruct storm drainage systems in the West Drive UPS Area and Northeast Parking Area. iv) Replace the courtyard storm lift station with a new structure, pumps, and controls per P106, S102, and E103. v) Connect building downspouts, area drains, and surface runoff to the new storm sewer system. c. Water System Improvements: i) Replace domestic water laterals, valves, and fittings per C109. ii) Reconstruct the water system serving the Cooling Tower and Pump House per P101 and P103-P105. iii) Install new water piping, backflow preventers, thrust restraints, and appurtenances per P109-P110. a. Lift Station Improvements: The following lift station systems shall be constructed as shown on the Contract Drawings: iv) Storm Lift Station (Courtyard) v) Sanitary Lift Station vi) Admin Wing and Cafeteria Expansion Drain Tile Lift Station vii) Each lift station shall include precast concrete basins; duplex pump systems; discharge piping, valves, and guide rails; access hatches, ladders, and platforms; electrical power, controls, alarms, and BAS/SCADA interfaces; factory startup, functional testing, and operator training; and provisions for confined space entry and maintenance access. viii) Installation of duplex pump systems, discharge piping, controls, alarms, and monitoring equipment for each lift station, including factory startup and training. b. Electrical Improvements: i) Provide all electrical service, power distribution, control panels, conduits, wiring, alarms, and interfaces required for lift stations and site utilities per E101-E110. ii) Integrate all lift stations with the Facility Building Automation System (BAS). c. Civil Site Restoration: d. Restore all disturbed pavements, curbs, sidewalks, striping, fencing, landscaping, and site features per C121- C130. e. Regrade and reseed disturbed areas. f. Restore ADA-compliant walkways and parking areas where impacted. g. Install new fencing and gates as detailed. 1. Scope Notes: a. The sequence of work presented in this Scope of Work is suggestive and may be reordered or reprioritized by the Contractor as necessary to meet project requirements. b. The Contractor shall furnish all materials, equipment, and labor required to complete the work in an orderly and timely manner. c. Prior to demobilization, all work areas and staging areas shall be cleaned and restored to their original condition. Damage to FAA facilities or property resulting from unauthorized or out-of-scope Contractor actions shall be repaired or replaced at the Contractor's expense.

GC Bidding

Water / Sewer

$4,000,000.00

Public - Federal

Demolition, Site Work

70

18

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
142
Bidding Soon
2,109
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2026

August 31, 2026

Project location map

512 Division St, Farmington, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.