Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 15, 2026 at 8:00 PM
Updated June 16, 2026
Site work for a playground / park / athletic field in Monterey, California. Completed plans call for site work for a playground / park / athletic field.
Revitalization of various turf areas, installation of new mulch and plantings across the campus, and potential addition of irrigation. Question Deadline 06/08/2026 at 10:00 AM PT A. Description: 1. The Monterey Peninsula College, Campus Wide Landscape Revitalization project consists of LANDSCAPING in the following location(s): a. Campus wide 2. The Contractor shall be responsible for scheduling and coordinating the work with the MPC Staff, Representatives, and contractors on other MPC projects working concurrent with this project. Reference paragraph 1.04 of this section. 3. The work to be done includes all labor, tools and equipment necessary to furnish and install all materials and equipment shown on the drawings and to perform tests described herein, to provide complete and operating systems to the extent specified and shown on the drawings. The Contractor shall furnish all equipment, material and supplies, except where specifically noted as existing or supplied by the District. B. Location of Work: 1. The project is located on the Monterey Campus at 980 Fremont Street, Monterey, CA 93940.
Post-Bid
Playgrounds / Parks / Athletic Fields
$1,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2026
July 10, 2026
980 Fremont St, Monterey, CA
Related To This Project
Monterey, CA
Bid Date: Jun 30 2026
Monterey, CA
Bid Date: Jun 26 2026
Monterey, CA
--
Monterey, CA
Bid Date: Jun 30 2026
Monterey, CA
Bid Date: Jun 04 2026
Monterey, CA
Bid Date: Jun 18 2026
Monterey, CA
Bid Date: Apr 21 2026
Monterey, CA
Bid Date: Jun 02 2026
Monterey, CA
Bid Date: May 05 2026
Monterey, CA
Bid Date: May 05 2026
Monterey, CA
Bid Date: May 06 2026
Monterey, CA
Bid Date: May 06 2026
Monterey, CA
Bid Date: May 27 2026
Monterey, CA
Bid Date: May 26 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
