Happy Independence Day

Life, liberty, and the pursuit of better bids.

Buy Now →
BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 7, 2026 at 8:00 PM

Updated June 16, 2026

Demolition, site work and new construction of a multi-residential development in Bryan, Texas. Completed plans call for the demolition of a multi-residential development; for the construction of a multi-residential development; and for site work for a multi-residential development.

The City of Bryan is soliciting bids for the demolition and reconstruction of a residential structure located at 805 Boulevard Street in Bryan, Texas. Question Deadline 06/09/2026 at 10:00 AM CT all questicuest for Bid shall be addressed in writing via the Brazos Valley web site Work to be performed in the construction drawings and Building Notes shall comply with the manufacturer's recommendations and all currently adopted International Building Codes and Electrical Code, as well as all other applicable City codes, code amendments and ordinances. 2. Inclement Weather Days - It is imperative to maintain a tight timeline for the demolition and construction activities of this project. Days to complete the project may be added to the original Contract Time for only the bulleted reasons listed below and only if requested in writing from the Contractor within 5 business days of the inclement weather and only during the original Contract Time period. It will be up to the Contractor to prove the inclement weather at the project site impeded the progress of the work. If inclement weather day extensions are added to the Contract Time, they will be provided in a written Change Order and executed by the Owner, Contractor and City Staff Representative. Any time delays over the Contract Time, as may be revised, will be assessed liquidated damages as per the Tri-Party Agreement contract. a. Rainfall in excess of 1/4 " per day. Project Manager, at his/her discretion, may allow additional days for drying of the ground or issues impeding concrete placement. This will only be allowed until the Contractor has had reasonable time to frame the structure with roof decking and a rolled asphalt cover protecting the building from rainfall inside the structure. b. Weather in which the low temperature is below 32o and the high temperature does not advance above 45o per day. Project Manager, at his/her discretion, may allow additional days for issues impeding concrete placement. This will only be allowed until the Contractor has had reasonable time to frame the structure, and is able to place sheathing over the building exterior envelope openings to heat the building interior by safe mechanical means. 3. All parties involved with the contract agreement shall be in agreement with the contract documents and any other alterations before work commences. 4. All products, appliances, equipment, fixtures and materials used in connection with this work are to be of new, premium grade quality without defects - unless stated otherwise or preapproved by the Project Manager. Any finish out products damaged during shipping, loading / unloading, staging or installation shall be repaired or replaced to "like new" condition by the Contractor. 5. All materials shall be installed according the industry best practice standards, and in full accordance with the manufacturer's specifications for working conditions, surface preparation, methods, protection and testing. 6. "Install" or "installation" means to purchase, set up, test and warrant a new component unless otherwise noted. 7. All measurements (i.e. SF of Drywall or those provided w/ drawings) are for the contractor's convenience. Contractor must field verify all dimensions and all quantities (i.e. number of window units) of material. No claim for additional funds due to discrepancies in measurements or quantities shall be honored, if the discrepancies were not submitted to the Project Manager prior to bid submission. 8. The contractor must inspect the property. Submission of a bid is presumptive evidence that the bidder has thoroughly examined the site and is conversant with the requirements of the local jurisdiction. 9. If required, Contractor shall install an agency provided sign where directed by the Project Manager. No other signs are permitted. 10.Conform to OSHA requirements for all construction / equipment operations and material installation. 11.New dwelling to be 2 Bedroom / 2 Bath, approximately 1173.5 square feet heated area - per plans. 12.Contractor will be required to provide certification of builder's warranty for the term limits of the former TRCC warranty as identified here: 1-year warranty for workmanship and materials; 2-year warranty for mechanical delivery systems; 10-year warranty for major structural components of the Home; and 10-year warranty of habitability

GC Bidding

Multi-Residential

$1,500,000.00

Public - City

Demolition, New Construction, Site Work

5

6

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
428
Active Projects
54
Bidding Soon
3,237
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.