BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2026 at 8:00 PM

Updated June 4, 2026

Site work and new construction of a mixed-use development in Hope, Arkansas. Completed plans call for the construction of a power facility; power facility; for site work for a power facility; and power facility.

Design, build, and maintain a solar energy generation facility with a maximum generating capacity of up to 1.9 megawatts (MW)(ac) and a battery energy storage system (BESS) of approximately 8 MW (ac), dischargeable over a two-hour period (approximately 16 MWH (ac)). As described above , the Project is envisioned to have two components : ( 1) a low voltage (480 / 277V AC at 60Hz ), ground - mounted solar energy generation facility capable of delivering up to 1.9 MW (ac ) during peak insolation periods , and (2) a battery energy storage system of approximately 8 MW (ac ) that is dischargeable over a two (2) hour period . Both components of the Project will interconnect with the HWL distribution system at a metering point set by HWL on the Project site . a . General Design Requirements i. Site design that is cleared and graded to support drainage . ii. Low maintenance site preparation with environmentally compatible ground cover . iii . Fencing , gates , and security monitoring . iv . Internal pathways . v . Underground conduit where appropriate . vi . Acreage of solar array limited to a maximum of 7 acres / MW ac . vii . Parallel wiring architecture . viii . The DC : AC ratio of the solar array will be 1.25 : 1.0 or greater . ix . The Project will support 24/7 real -time remote monitoring and operation , including dispatch of BESS. x . The solar array must maintain a power factor greater than 0.95 during operation . xi . Design must be tailored to site -specific seismic criteria and weather conditions . xii . Design and installation must comply with applicable industry standards (IEEE, UL, NEC , etc. ) . xiii . Final Completion certification shall use ASTM 2848 or IEC 61724-2 capacity testing protocols . xiv . All equipment must be listed as Tier 1 by an industry trade organization

GC Bidding

Solar Power Generation

$3,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
24
Bidding Soon
413
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2026

August 14, 2026

Project location map

105 N. Elm St., Hope, AR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.