Published June 3, 2026 at 8:00 PM
Updated June 4, 2026
Site work and new construction of a mixed-use development in Hope, Arkansas. Completed plans call for the construction of a power facility; power facility; for site work for a power facility; and power facility.
Design, build, and maintain a solar energy generation facility with a maximum generating capacity of up to 1.9 megawatts (MW)(ac) and a battery energy storage system (BESS) of approximately 8 MW (ac), dischargeable over a two-hour period (approximately 16 MWH (ac)). As described above , the Project is envisioned to have two components : ( 1) a low voltage (480 / 277V AC at 60Hz ), ground - mounted solar energy generation facility capable of delivering up to 1.9 MW (ac ) during peak insolation periods , and (2) a battery energy storage system of approximately 8 MW (ac ) that is dischargeable over a two (2) hour period . Both components of the Project will interconnect with the HWL distribution system at a metering point set by HWL on the Project site . a . General Design Requirements i. Site design that is cleared and graded to support drainage . ii. Low maintenance site preparation with environmentally compatible ground cover . iii . Fencing , gates , and security monitoring . iv . Internal pathways . v . Underground conduit where appropriate . vi . Acreage of solar array limited to a maximum of 7 acres / MW ac . vii . Parallel wiring architecture . viii . The DC : AC ratio of the solar array will be 1.25 : 1.0 or greater . ix . The Project will support 24/7 real -time remote monitoring and operation , including dispatch of BESS. x . The solar array must maintain a power factor greater than 0.95 during operation . xi . Design must be tailored to site -specific seismic criteria and weather conditions . xii . Design and installation must comply with applicable industry standards (IEEE, UL, NEC , etc. ) . xiii . Final Completion certification shall use ASTM 2848 or IEC 61724-2 capacity testing protocols . xiv . All equipment must be listed as Tier 1 by an industry trade organization
GC Bidding
Solar Power Generation
$3,000,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 15, 2026
August 14, 2026
105 N. Elm St., Hope, AR
Related To This Project
Hope, AR
--
Hope, AR
Bid Date: May 20 2026
Hope, AR
Bid Date: Mar 20 2026
Hope, AR
Bid Date: Apr 02 2026
Hope, AR
Bid Date: Mar 17 2026
Hope, AR
Bid Date: Mar 02 2026
Hope, AR
Bid Date: Mar 26 2026
Hope, AR
Bid Date: Mar 04 2026
Hope, AR
Bid Date: Feb 11 2026
Hope, AR
Bid Date: Jan 22 2026
Hope, AR
Bid Date: Jan 21 2026
Hope, AR
Bid Date: Dec 18 2025
Hope, AR
Bid Date: Dec 18 2025
Hope, AR
Bid Date: Dec 12 2025
Hope, AR
Bid Date: Feb 05 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.