BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 12, 2026 at 8:00 PM

Updated June 13, 2026

Demolition, remodeling and renovation of a medical facility in Las Vegas, Nevada. Completed plans call for the demolition of a medical facility; for the remodel of a medical facility; and for the renovation of a 3,400-square-foot, seven-story above grade medical facility.

Remodel of approximately 3,400 square feet on the 6th floor of the UMC 7 Story Tower to create new office space. All questions/requests for clarification related to this Bid must be received in the NGEM system no later than 4:00 p.m. on Monday, June 22, 2026 Scope This Project is located at 1800 W Charleston Blvd, Las Vegas, NV 89102. The work includes a refresh of approximately 3,400 square feet for the new location of a physical therapy (PT) office space on the 6th floor of the 5000 building. The new work will consist of refreshing finishes for the entire space. The renovation work will include, but not be limited to, demolition of flooring, finishes, and upgrades to the existing light fixtures. New electrical and data will be required to accommodate working stations. General contractors and subcontractors are responsible to reference construction documents. The electrical contractor is to provide drawings for permitting to meet the needs, per the reference drawings. Work shall meet the UMC standard specification sheets. All relevant documents are attached to the bid. Work will be during the day hours (6:30 a.m. to 5:00 p.m.), Monday through Friday. Major utility disruptions must be scheduled 48 hours in advance and will need to be performed after business hours (off hours) for the occupants. The project duration is scheduled to be 120 days from the date of issuance of a Notice to Proceed. Access controls and all fire detection systems for the building are provided by Honeywell. Any additional/new card readers will need to be integrated with the Honeywell access controls system.

GC Bidding

Medical

$305,000.00

Public - State/Provincial

Demolition, Remodeling, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
24
Bidding Soon
513
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2026

August 10, 2026

Project location map

1800 W Charleston Blvd, Las Vegas, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.