Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 10, 2026 at 8:00 PM
Updated June 11, 2026
Site work and new construction of a water / sewer project in Hood River, Oregon. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
Bids Open 07/02/2026 at 2:00 PM PT Cost proposals will be opened and read at the District office The proposed work consists of the following major items as further defined in the Proposal Documents: o Furnish, offload, stage and install approximately 15,300-LF of 26" dia. to 6" dia. Solid-Wall HDPE Pipe and all Reducer, Bends, Tees, End Connection; o Furnish and Install five Filtration and Pressure Reducing Stations; o Provide associated mobilization, selective demolition, tree removal, trenching, earthwork, backfill, compaction, surface restoration, other restoration; o Slip-line proposed HDPE through existing culverts at road crossings; o Coordinate utility locations and relocations as necessary; coordinate with Owner and Owner's Engineer; and furnish and install all other associated flow control valves, stub turnouts, cleanout assemblies, air and vacuum valve assemblies, valves and valve cans, and appurtenances necessary to provide a complete project ready for irrigation delivery. The time for substantial completion will commence with project staking and staging access (not over existing canal or pipes) to the Project area on August 19 th 2026 and access to Project alignments on October 1, 2026. The substantial completion period will end on March 1, 2027. Liquidated damages of $2,000.00 per day for the first ten (10) days and $10,000.00 per day thereafter will be assessed if the contractor fails to achieve substantial completion within the time allowed. Restoration, demobilization from the site, and all closeout and punch-list items are to be completed by April 30, 2027. Contractors shall use recyclable products to the maximum extent economically feasible in the performance of the contract work. Disadvantaged Business Enterprises are encouraged to propose on this project. The project and associated Proposal are subject to grant conditions provided in the Proposal Documents. Bonds: 10% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. For questions regarding these contract documents contact: Kevin L. Crew, P.E. Black Rock Consulting, Inc. Bend, OR 97703 (541) 480-6257 blackrockci@gmail.com
GC Bidding
Water / Sewer
$4,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2026
August 19, 2026
3500 Graves Road, Hood River, OR
Related To This Project
Hood River, OR
Bid Date: Apr 30 2026
Hood River, OR
--
Hood River, OR
Bid Date: May 21 2026
Hood River, OR
Bid Date: May 06 2026
Hood River, OR
Bid Date: Apr 23 2026
Hood River, OR
--
Hood River, OR
Bid Date: Feb 27 2026
Hood River, OR
Bid Date: Dec 18 2025
Hood River, OR
Bid Date: Nov 11 2025
Hood River, OR
Bid Date: Oct 17 2025
Hood River, OR
Bid Date: Aug 06 2025
Hood River, OR
Bid Date: Aug 04 2025
Hood River, OR
Bid Date: Jun 24 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
