Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 16, 2026 at 8:00 PM

Updated October 19, 2026

Site work for a bridge / tunnel in Hood River, Oregon. Completed plans call for site work for a bridge / tunnel.

Marine construction activities associated with the installation and testing of piles to support development of the temporary work trestle design. The Hood River-White Salmon Bridge Authority (Authority) invites sealed bids from the pre- qualified marine construction contractors to furnish all labor, material, equipment, marine plant, transportation , temporary works , environmental controls, The anticipated Work includes installation of sixteen (16) 36-inch-diameter steel pipe piles with a nominal 3/4-inch wall thickness and an estimated total installed length of approximately 1,900 linear feet. Individual installed lengths are anticipated to range from approximately 67 feet to 191 feet. Final requirements are established by the Contract Documents. Contractor shall mobilize, perform the Work within the allowed in-water work window, and demobilize in accordance with the Contract schedule. Install eight (8) test piles using vibratory and impact hammers. The Work is anticipated to include: Pile locations provided in the Contract Documents. Wave Equation Analysis Program (WEAP), Pile Driving Analyzer (PDA), and CAPWAP analyses included in pricing. Bubble curtain system during impact driving, subject to final permit and Contract requirements. Coordination with acoustic and turbidity monitoring activities. Question Deadline 10/05/2026 Requests for information or clarification must be submitted in writing to the single point of contact Andrew Gong contracts@hrwsba.gov

Post-Bid

$1,200,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
59
Bidding Soon
1,241
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2026

January 5, 2027

Project location map

To Be Determined, Hood River, OR


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed