BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 11, 2026

Site work and new construction of a water / sewer project in Hood River, Oregon. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Bids Open 07/02/2026 at 2:00 PM PT Cost proposals will be opened and read at the District office The proposed work consists of the following major items as further defined in the Proposal Documents: o Furnish, offload, stage and install approximately 15,300-LF of 26" dia. to 6" dia. Solid-Wall HDPE Pipe and all Reducer, Bends, Tees, End Connection; o Furnish and Install five Filtration and Pressure Reducing Stations; o Provide associated mobilization, selective demolition, tree removal, trenching, earthwork, backfill, compaction, surface restoration, other restoration; o Slip-line proposed HDPE through existing culverts at road crossings; o Coordinate utility locations and relocations as necessary; coordinate with Owner and Owner's Engineer; and furnish and install all other associated flow control valves, stub turnouts, cleanout assemblies, air and vacuum valve assemblies, valves and valve cans, and appurtenances necessary to provide a complete project ready for irrigation delivery. The time for substantial completion will commence with project staking and staging access (not over existing canal or pipes) to the Project area on August 19 th 2026 and access to Project alignments on October 1, 2026. The substantial completion period will end on March 1, 2027. Liquidated damages of $2,000.00 per day for the first ten (10) days and $10,000.00 per day thereafter will be assessed if the contractor fails to achieve substantial completion within the time allowed. Restoration, demobilization from the site, and all closeout and punch-list items are to be completed by April 30, 2027. Contractors shall use recyclable products to the maximum extent economically feasible in the performance of the contract work. Disadvantaged Business Enterprises are encouraged to propose on this project. The project and associated Proposal are subject to grant conditions provided in the Proposal Documents. Bonds: 10% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. For questions regarding these contract documents contact: Kevin L. Crew, P.E. Black Rock Consulting, Inc. Bend, OR 97703 (541) 480-6257 blackrockci@gmail.com

GC Bidding

Water / Sewer

$4,000,000.00

Public - City

New Construction, Site Work

24

13

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
64
Bidding Soon
1,292
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2026

August 19, 2026

Project location map

3500 Graves Road, Hood River, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.