BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Site work and renovation of a water / sewer project in Atascocita, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Rehabilitation of four lift station wet wells and valve vaults, and rehabilitation of two force main manholes for Harris County MUD No. 290. LIFT STATION NO . 1 16804 1/2 EAGLE SPRINGS PKWY HUMBLE , TX 77346 LIFT STATION NO . 3 13302 1/2 VALLEY LODGE PKWY ATASCOSITA , TX 77346 LIFT STATION NO . 2 17260 1/2 TIMBER FOREST DR ATASCOSITA , TX 77346 LIFT STATION NO . 4 12828 1/2 VALLEY LODGE PKWY HUMBLE , TX 77346 Question Deadline 06/18/2026 Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request online to the www.civcastusa.com system for such information to Engineer not less than seventy -two hours (72 hours ) before the Bid opening . The rehabilitation of existing HCMUD 290 Lift Station No. 1 to include cleaning and repair of existing T- Lock lining system , as directed by Engineer ; removal and replacement of 12" wet well piping , fittings , and supports ; pressure washing of entire valve vault ; abrasive blasting and recoating of existing valve vault piping ; and backfill of void beneath existing valve vault slab , as directed by Engineer . The rehabilitation of existing HCMUD 290 Lift Station No. 2 to include cleaning and repair of existing T- Lock lining system , as directed by Engineer ; removal and replacement of all 10 " piping , fittings , valves , and supports in existing wet well and valve vault ; pressure washing of entire valve vault ; and replacement of the on - site natural gas line . The rehabilitation of existing HCMUD 290 Lift Station No. 2 forcemain discharge manhole to include the removal and disposal of existing T-Lock liner ; concrete crack repairs , as directed by Engineer ; application of entire manhole surfaces with 1- inch cementitious structural lining ; and manhole coating , per spec 09901 . The rehabilitation of existing HCMUD 290 Lift Station No. 3 to include cleaning and repair of existing T- Lock lining system , as directed by Engineer ; removal and replacement of 10" wet well piping , fittings , and supports ; pressure washing of entire valve vault ; abrasive blasting and recoating of existing valve vault piping . The rehabilitation of existing HCMUD 290 Lift Station No. 3 forcemain discharge manhole to include the removal and disposal of existing T-Lock liner ; concrete crack repairs , as directed by Engineer ; application of entire manhole surfaces with 1- inch cementitious structural lining ; and manhole coating , per spec 09901 . The rehabilitation of existing HCMUD 290 Lift Station No. 4 to include cleaning and repair of existing T- Lock lining system , as directed by Engineer ; removal and replacement of 4" wet well piping , fittings , and supports ; pressure washing of entire valve vault ; abrasive blasting and recoating of existing valve vault piping

GC Bidding

Water / Sewer

$1,500,000.00

Public - County

Renovation, Site Work

23

18

4

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
473
Active Projects
165
Bidding Soon
3,683
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2026

August 24, 2026

Project location map

Multiple Locations, Atascocita, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.