BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2026 at 8:00 PM

Updated June 5, 2026

Renovation of a municipal facility in Pecos, Texas. Completed plans call for the renovation of a municipal facility.

Reeves County is searching for an environmental abatement company to remove asbestos from the facility at 700 W. Daggett St., Pecos, TX 79772. All work is to be performed in accordance with all applicable federal, state, and local regulations, including OSHA, EPA, Texas DSHS, and applicable state asbestos requirements. Question Deadline 06/17/2026 at 5:00 PM CT Do not contact the requesting department. Any questions or additional information required by interested vendors must be emailed to bidquestions@reevescounty.org . Bid number and title must be on the "Subject Line" of the email. Attempts to circumvent this requirement may result in rejection of the bid as noncompliant. Tentative Award Date: July 27, 2026 The contractor shall provide the labor, materials, equipment, mobilization, demobilization, and disposal fees to abate the asbestos-containing material (AMC), asbestos containing caulk or glazing, and pipe insulation under the building from the property. The work shall include barriers and containment to prevent the material from leaving the site. The contractor shall bag and label the asbestos materials and dispose of it properly at an approved location. The contractor shall perform a final cleanup of the areas with asbestos material was found. The contractor shall receive the asbestos survey report with the areas containing asbestos material. The following areas of the facility require abatement of asbestos-containing materials but is not limited to approximately 9,150 square feet: _ C01- Plaster ceiling (Approx. 500 square feet). _ E01- Exterior window caulk (Approx. 10 square feet). _ E02- Exterior window glazing (Approx. 10 square feet). _ F01- 12"x 12" Beige, rock pattern, resilient floor tile with black mastic (Approx. 680 square feet). _ F03- 9"x 9" Beige w/multi streaks, resilient floor tile with black mastic (Approx. 1,545 square feet). _ F04- 12"x 12" Tan w/blue streaks, resilient floor tile with black mastic (Approx. 480 square feet). _ F05- 12"x 12" White w/dark streaks, resilient floor tile with black mastic (Approx. 1,315 square feet). _ F06- 9"x 9" Beige, broken rock pattern, resilient floor tile with black mastic (Approx. 160 square feet). _ F07- 9"x 9" Beige w/green streaks, resilient floor tile with black mastic (Approx. 2,530 ft2). _ I01- Boiler insulation (Approx. 200 square feet). _ I02- Pipe insulation (Approx. 1,000 square feet). _ I03- Duct insulation (Approx. 400 square feet). _ W03- Transit wall panels (Approx. 320 square feet).

Sub-Bidding

Municipal

$200,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
4
Bidding Soon
132
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2026

July 27, 2026

Project location map

700 W Daggett St, Pecos, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.