Happy Independence Day

Life, liberty, and the pursuit of better bids.

Buy Now →
BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Site work for a road / highway in Wappingers Falls, New York. Completed plans call for site work for a road / highway.

Reference Number 0000425978 The Town of Wappinger is seeking a vendor to linestripe newly paved roads within the town. This will consist of approximately 37 miles of double yellow centerlines and 22 miles of white edge lines. This work is to begin no later than early July 2026 as paving is set to be completed by mid to late June 2026. Question Deadline 06/08/2026 at 12:00 PM ET Questions are submitted online No The painted lines shall be protected by a follow-up vehicle equipped with a sequential flashing arrow panel, capable of flashing left to right, right to left or pass either side, traveling approximately 1,000 feet after the unit making the application. All traffic lines painted shall conform in every respect to the New York State Manual of Uniform Traffic Control Devices, especially as to color, width and spacing of lines, dashed or solid line and locations for changes in type of line and sight distance. All paint shall be applied at the minimum rate of one (1) gallon for every three hundred (300) feet of solid four (4) inch line. The same rate of application shall apply for skip or broken lines. Glass beads for reflectorization shall be applied to all painted lines at the minimum rate of seven (7) pounds per gallon of paint for center lines and six (6) pounds per gallon for the edge lines. The painted traffic lines shall follow the center line of the road. They shall be straight and true on tangents and uniform on curves. Repainting of center lines and edge lines shall coincide with the existing traffic line markings. The contractor shall be responsible for the one hundred percent (100%) reflectorization of all traffic lines painted. Should the painted lines not receive enough beads for the reflectorization required the contractor shall be held responsible for correcting the same at his expense. All paint shall be applied at a temperature that will ensure it is track-free within one hundred eighty (180) seconds of it being applied to the pavement. Edge lines shall be done while striping machine is on the pavement surface and under no circumstances shall it travel on the shoulders. There shall be no work performed on Sundays.

Post-Bid

Roads / Highways

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,061
Active Projects
153
Bidding Soon
6,841
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2026

July 13, 2026

Project location map

Multiple Locations, Wappingers Falls, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.