Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 15, 2026 at 8:00 PM
Updated June 16, 2026
Site work for a road / highway in Wappingers Falls, New York. Completed plans call for site work for a road / highway.
Reference Number 0000425978 The Town of Wappinger is seeking a vendor to linestripe newly paved roads within the town. This will consist of approximately 37 miles of double yellow centerlines and 22 miles of white edge lines. This work is to begin no later than early July 2026 as paving is set to be completed by mid to late June 2026. Question Deadline 06/08/2026 at 12:00 PM ET Questions are submitted online No The painted lines shall be protected by a follow-up vehicle equipped with a sequential flashing arrow panel, capable of flashing left to right, right to left or pass either side, traveling approximately 1,000 feet after the unit making the application. All traffic lines painted shall conform in every respect to the New York State Manual of Uniform Traffic Control Devices, especially as to color, width and spacing of lines, dashed or solid line and locations for changes in type of line and sight distance. All paint shall be applied at the minimum rate of one (1) gallon for every three hundred (300) feet of solid four (4) inch line. The same rate of application shall apply for skip or broken lines. Glass beads for reflectorization shall be applied to all painted lines at the minimum rate of seven (7) pounds per gallon of paint for center lines and six (6) pounds per gallon for the edge lines. The painted traffic lines shall follow the center line of the road. They shall be straight and true on tangents and uniform on curves. Repainting of center lines and edge lines shall coincide with the existing traffic line markings. The contractor shall be responsible for the one hundred percent (100%) reflectorization of all traffic lines painted. Should the painted lines not receive enough beads for the reflectorization required the contractor shall be held responsible for correcting the same at his expense. All paint shall be applied at a temperature that will ensure it is track-free within one hundred eighty (180) seconds of it being applied to the pavement. Edge lines shall be done while striping machine is on the pavement surface and under no circumstances shall it travel on the shoulders. There shall be no work performed on Sundays.
Post-Bid
Roads / Highways
$200,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2026
July 13, 2026
Multiple Locations, Wappingers Falls, NY
Related To This Project
Wappingers Falls, NY
--
Wappingers Falls, NY
--
Wappingers Falls, NY
--
Wappingers Falls, NY
Bid Date: May 20 2026
Wappingers Falls, NY
Bid Date: Apr 16 2026
Wappingers Falls, NY
Bid Date: Jul 15 2026
Wappingers Falls, NY
--
Wappingers Falls, NY
--
Wappingers Falls, NY
--
Wappingers Falls, NY
Bid Date: Nov 20 2025
Wappingers Falls, NY
Bid Date: Feb 25 2021
Wappingers Falls, NY
Bid Date: Oct 30 2025
Wappingers Falls, NY
--
Wappingers Falls, NY
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
