BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 8, 2026 at 8:00 PM

Updated June 10, 2026

Site work for a water / sewer project in Edgemont, South Dakota. Completed plans call for site work for a water / sewer project.

The contractor shall provide all labor, materials, equipment, testing, and documentation necessary for the removal of the existing and replacement of a new deep-well pump system for a 921-foot well, including the installation of a new 5 HP submersible pump and associated controls. See the SOW, SPECS, and SOI for additional information. Questions are due by June 16, 2026, at 9:00 a.m. Central Daylight Time and Quotes are due by July 15, 2026, at 9:00 a.m. Central Daylight Time. email addresses for submission of questions Janice King , Contract Specialist , at janice.king@usda.gov and Lucas Dahlman , Contracting Officer , at lucas.dahlman@usda.gov . In the submission of your questions , include in the email's subject line : Tepee Work Center Well Pump Project Quote - 1240LT26Q0079 . Solicitation number 1240LT26Q0079 is issued as a Request for Quotation (RFQ ) for the replacement of a deep-well pump system for a 921 -foot well , including the installation of a 5 HP submersible pump and associated controls . The contractor shall provide all labor, materials , equipment , testing , and documentation necessary to remove and replace the existing well pump system . The existing pump system for the 921 -foot well has exhibited signs of failure , diagnostic evaluation leads to the well pump has seized . Historical data for this site details how the previous well pump had been seized due to rust . The system utilizes a deep-well submersible pump , originally installed to support agricultural or facility water supply operations . The SOW outlines the requirements for assessment , repair , replacement , testing , and commissioning of a new 5 HP submersible pump system and associatedsurface controls .

Sub-Bidding

Water / Sewer

$10,000,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
10
Bidding Soon
161
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2026

June 30, 2026

Project location map

10623 Tepee Work Center Loop, Edgemont, SD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.