BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2026 at 8:00 PM

Updated June 12, 2026

Site work for a water / sewer project in Turlock, California. Completed plans call for site work for a water / sewer project.

The City is requesting proposals from qualified firms to provide construction management services for City Project No. 25-057: System Wide AMI and Water Meter Installation - Phase 1. Qualified vendors should review the requirements for submission, the scope of services, and the evaluation criteria. Question Deadline Jun 18, 2026 at 3:00 PM Deadline for submission of questions regarding the RFP by electronically DESCRIPTION OF WORK - Sealed proposals will be received by the City Engineer of the City of Turlock , Engineering Division for System Wide AMI and Water Meter Installation - Phase 1. The work consists in general of replacing approximately 4,293 existing water meters with City -furnished Badger Meters and endpoints , and establishing the Badger Advance Meter Infrastructure Software (Beacon Saas) . The meters to be replaced are located across the City . SeeAttachment F for list of project addresses scheduled for meter replacement . Estimated list of meters , include : o 3/4 " meters - 842 o 1.0 " meters 3,351 - o 1.5 " meters 100 The contractor is required to locate the meter boxes and verify the sizes for all meters , boxes , lids , private valves , and other pertinent information listed by the City . The Contractor shall assessthe condition of the existing meter boxes , lids , and valves and provide their opinion to the Engineer as to whether replacement or installation is recommended . The Engineer will review the Contractor's assessment and direct the Contractor as to which specific meter boxes , lids , and private valves are to be replaced or installed . The City has provided an estimate of meter boxes , lids , and valves to be replaced / installed based on a sampling of meters in the bid item list . The Contractor will be responsible for ensuring all specific electronic reading requirements of the Badger AMI Software system are recorded and migrated into the City's billing software . The work includes all necessary labor , materials , tools , equipment and any incidentals needed to perform the improvements .

GC Bidding

Water / Sewer

$3,723,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
377
Active Projects
100
Bidding Soon
2,345
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2026

August 3, 2026

Project location map

To be determined, Turlock, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.