BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2026 at 8:00 PM

Updated June 4, 2026

Renovation of a mixed-use development in Martinez, California. Completed plans call for the renovation of a medical facility and military facility.

02 41 00 - Demolition 02 00 00 - Existing Conditions 03 00 00 - Concrete 05 00 00 - Metals 07 00 00 - Thermal and Moisture Protection 09 00 00 - Finishes 23 00 00 - Heating, Ventilating, and Air Conditioning (HVAC) 26 00 00 - Electrical 27 00 00 - Communications 31 00 00 - Earthwork 32 00 00 - Exterior Improvements Your proposals are due no later than June 15, 2026 12:00 PM . Here is some of the project information. It includes, but is not limited to: Martinez Campus Building 19 work summary: Required work to remediate existing shortcomings: 1. Remove and replace appropriate portions of the fuel leak detection system related to replacement equipment ensure leak detection system is tied into existing building management system (BMS) system. 2. Ensure pump controls are integrated with existing BMS system and day tank/fuel tank level controls to remain. 3. Excavate and replace underground fuel piping. 4. Remove and replace pump assembly and controller for 6,000-gallon fuel tank. 5. Remove sump basin and leak detection float switch. 6. Remove capped piping which previously lead to a boiler. 7. Ensure all materials and fuel are properly disposed of as required. 8. Provided replacement fuel piping shall be double wall containment with line leak detection. 9. Remove and replace above grade fuel piping. 10. Remove and replace all systems valving, ensuring a fully operational system is installed. Martinez Campus Building 20 work summary: Required work to remediate existing shortcomings: 1. Remove and replace appropriate portions of the fuel leak detection system related to replacement equipment ensure leak detection system is tied into existing BMS system. 2. Ensure pump controls are integrated with existing BMS system and day tank/fuel tank level controls to remain. 3. Excavate and replace underground fuel piping. 4. Remove and replace pump assembly and controller for 6,000-gallon fuel tank. 5. Remove and replace the leak detection system. 6. Dispose of all materials and waste fuel in accordance with all VA, local, state, and federal guidelines. 7. Provided replacement fuel piping shall be double wall containment with line leak detection. 8. Remove and replace above grade fuel piping. 9. Remove and replace all system valving ensuring a fully operational system is installed. 10. Provide fuel-polishing system to ensure contaminant free fuel supply. 11. Remove sump basin and leak detection float switch. 36C26126R0048 14 Mare Island Campus work summary: Required work to remediate existing shortcomings: 1. Remove and replace existing 3” and 1” double wall containment fuel piping. 2. Where double-wall containment cannot be installed, a containment pan will be provided under single-wall piping. 3. Dispose of all materials and waste fuel in accordance with all VA, local, state, and federal guidelines. 4. Remove and replace all system valving ensuring a fully operational system is installed. 5. Remove and replace duplex supply pumps. 6. Remove and replace the return pump and provide a proper NEMA enclosure to protect it from the elements. *Prior to final acceptance, Contractor shall thoroughly clean provided equipment, entire project area and surrounding project area (as directed by the Contracting Officers’ Representative, COR) of grease, oil, plaster, dust, stains and/or other debris.

GC Bidding

Medical

$5,000,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
475
Active Projects
216
Bidding Soon
3,807
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2026

July 15, 2026

Project location map

150 Muir Rd, Martinez, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.