BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 27, 2026 at 8:00 PM

Updated August 18, 2026

Site work, paving and outdoor lighting for a sidewalk / parking lot in Doral, Florida. Completed plans call for site work for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The scope of work consists of the furnishing and installation of all parking lot lighting at Miami-Dade Sheriff's Office (MDSO) Headquarter parking lot located at 9105 NW 25th St., Doral, FL 33172. The bidder shall carefully examine the project site, verify all existing field conditions, take necessary measurements, and become fully informed as to the nature and extent of the work required. Submission of a bid constitutes acknowledgment that the Bidder has examined the site and accepts all observable conditions. Work includes, but is not limited to, furnishing all labor, materials, supervision, equipment, tools, transportation, services, permits, related permitting expenses, inspections, and all other items necessary to complete the parking lot lighting. Any questions, request for information (RFI), or clarification requests regarding the materials, site conditions, conflicts, obstacles or any other project related matter must be submitted in writing to the assigned Construction Contracts Specialist and copy the Clerk of the Board at clerk.board@miamidade.gov prior to the RFI submittal deadline of July 31, 2026. RFI responses, if required, shall be issued via addenda after the RFI submittal deadline. Only written addenda shall be considered binding. For RPQ's less than $10,000, if no LD rate is specified, the County reserves the right to assess actual damages in lieu of LDs. Work includes, but is not limited to, furnishing all labor, materials, supervision, equipment, tools, transportation, services, permits, related permitting expenses, inspections, and all other items necessary to complete the parking lot lighting. All work shall be done in accordance with the drawing and specifications. The bid price shall include: All related permit fees and permitting expenses related therewith. Removal and lawful off-site disposal of all work-related debris. Daily housekeeping. Maintaining the work site in a minimum broom-clean condition at all times. Anticipated Start Date: 9/1/2026 Calendar Days for Project Completion: 180 Estimated Value: $335,000

Post-Bid

Sidewalks / Parking Lot

$335,000.00

Public - County

Outdoor Lighting, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2026

September 1, 2026

Project location map

9105 NW 25th St, Doral, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.