Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 1, 2026 at 8:00 PM

Updated September 3, 2026

Site work and paving for a transportation facility in Burlington, Kentucky. Completed plans call for site work for a transportation facility.

The project involves the reconstruction of Taxiway M between connectors M1 and M3 due to increased cargo operations that have surpassed the original pavement design specifications. The existing concrete pavement is 14" thick, which is insufficient for the current heavier fleet mix, compared to a recent adjacent taxiway built with 21" concrete. The pavement condition has deteriorated and requires complete reconstruction after temporary fixes such as a 2" asphalt overlay have failed. Additionally, the project scope includes addressing pavement distress on the South ARFF ramp and parking lot since these areas have similar issues and are adjacent to Taxiway M. The intent is to complete all necessary reconstruction and repairs in these connected areas as part of one project. question deadline date changed from 06/18/2026 to 06/22/2026 as per Addendum 2 The Project includes full depth reconstruction of Taxiway M from Taxiway M3 to Taxiway M1 (Base Bid). Additional items include new centerline lights, drainage improvements, taxiway edge lights, and shoulder for Taxiway M, and reconstruction of ARFF pavements (Add On 1) which is ineligible and will be locally funded. Award is subject to final approval.

Award

Transportation Terminals

$1,646,010.00

Public - County

Paving, Site Work

84

17

5

5

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
132
Bidding Soon
2,530
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2026

August 14, 2026

Project location map

77 Comair Blvd, Burlington, KY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed