BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 16, 2026 at 8:00 PM

Updated July 8, 2026

Site work and new construction of a playground / park / athletic field in Booneville, Mississippi. Completed plans call for the construction of a playground / park / athletic field.

The project involves the construction of the Wiggy Field Dog Park, including design, final grading, selection of equipment and structures, installation of equipment and structures, emplacement of synthetic surfaces, and maintenance/replacement aspects. Interested firms are required to submit one original and five copies of their response, marked Request for Proposals – Wiggy Field Dog Park which should be received by the specified deadline. All submittals must have the bid title, company name and address, date and time of proposal, specifications, and Mississippi Certificate of Responsibility Number clearly indicated on the outside of the sealed envelope or container. Submittals without this information may be rejected. Last Day for Questions/Clarification submissions June 15, 2026 For questions concerning this Request for Proposal, contact; Contact Name: Jon Hill Mailing Address: 203 North Main Street, Booneville, MS 38829 Email Address: jhill@booneville-ms.gov Location: The project is located at: Swift Park 110 Dallison Drive Booneville, MS 38829 A jobsite visit is recommended but not required. Visits are intended to provide perspective and knowledge of the dog park area. The park is open from dusk till dawn. Questions arising from the visit must be submitted in writing. PROJECT SCOPE The project Wiggy Field Dog Park, includes design, final grading, selection of dog park equipment and structures, installation of equipment and structures, emplacement of and maintenance/replacement aspects. The proposed dog park will be located in a portion of the Swift Park. A parking lot runs along side of the site. The successful proposer shall furnish all labor, supervision, materials, equipment, transportation, and incidentals required to complete the Bark Park at Swift Park project. Work shall include, but not be limited to: Separate fenced areas for small and large dogs Double-gated bullpen entry points Agility and play equipment Shade structures Dog water fountains Benches and seating areas Concrete sidewalks and pedestrian circulation Entry structure/building Synthetic turf surfacing in equipment use areas Landscaping restoration as required ADA accessible pedestrian access

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
42
Bidding Soon
483
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2026

August 2, 2026

Project location map

110 Dallison Dr, Booneville, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.