BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2026 at 8:00 PM

Updated June 12, 2026

Site work for a development in San Luis Obispo, California. Completed plans call for site work for a development.

Reference Number 0000426750 In general, the project includes the removal of dry sediment that has built up in the creek bed and can imped natural water flow The project estimated construction cost and contract time established for the project is as follow: BASE BID: $62,000 5 working days ADDITIVE ALTERNATIVE "1": $48,000 5 working days ADDITIVE ALTERNATIVE "2": $80,000 5 working days ADDITIVE ALTERNATIVE "3": $55,000 5 working days TOTAL PROJECT BID (BASE BID + ADD ALT. "1" + ADD ALT "2" + ADD ALT "3"): $245,000 Base Bid Contract time is established as 5 working days. Award of Additive Alternative "1" will add an additional 5 days to the contract length. Award of Additive Alternative "2" will add an additional 5 days to the contract length. Award of Additive Alternative "3" will add an additional 5 working days to the contract length, for a total possible contract length of 20 working days. The fixed liquidated damages amount is established at $500 per day for failure to complete the work within the contract time. Each bid must be accompanied by either a: certified check cashier's check bidder's bond made payable to the City of San Luis Obispo for an amount equal to ten percent of the bid amount as a guaranty. Guaranty will be forfeited to the City San Luis Obispo if the bidder, to whom the contract is awarded, fails to enter into the contract. Question Deadline 06/26/2026 at 2:00 PM PT Questions are submitted online Yes The City of San Luis Obispo reserves the right to accept or reject any or all bids or waive any immaterial irregularities in a bid.

GC Bidding

Conservation and Development

$350,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
29
Bidding Soon
594
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2026

August 3, 2026

Project location map

919 Palm St, San Luis Obispo, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.