BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 28, 2026 at 8:00 PM

Updated August 1, 2026

Site work and new construction of a water / sewer project in Copperopolis, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Construction of the Copper Cove Lake Tulloch Intertie project located in Copperopolis, California. The Project for the Calaveras County Water District is located in the community of Copperopolis, California. The Project consists of the following work: 1. Construction of 12,700 LF of 12" Class 350 DIP transmission main with tracer wire that supplies the B4 Zone, located East of Lake Tulloch, from the C Tanks. 2. Installation of one (1) pressure reducing valve (PRV) station near Sanguinetti Drive, as indicated on the drawings and specifications. 3. Installation of air vacuum release valves and fire hydrant assemblies as indicated on the drawings and specifications. 4. Installation of gate valves as indicated on the drawings and specifications. The Engineers Estimate for this project is $7.0 million dollars. Construction of approximately 12,612 LF of 12" Class 350 DIP transmission main and a pressure reducing station.The pipeline includes connections to an existing 12" C900 PVC transmission main at O'Byrnes Ferry Rd, south of Cosmic Ct, an 12" C900 PVC transmission main at Sanguinetti Drive, and a 12" C900 PVC transmission main at the intersection of Conner Estates Drive and Calypso Beach Drive. Question Deadline 07/03/2026 Questionsreceived lessthan five days prior to the date for opening of Bids may not be answered. For further information or questions concerning these documents should be directed to: Calaveras County Water District 120 Toma Court San Andreas, CA 95249 Phone (209) 754-3181 Attn: Haley Airola HaleyA@ccwd.org A non-mandatory pre-bid conference will be held on June 15th at 10:00am at the intersection of OByrnes Ferry Road and Sanguinetti Drive. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.

Bid Results

Water / Sewer

$4,992,190.00

Public - County

New Construction, Site Work

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
292
Active Projects
92
Bidding Soon
1,795
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2026

September 7, 2026

Project location map

Conner Estates Dr & O'Byrnes Ferry Rd, Copperopolis, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.