Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 9, 2026 at 8:00 PM
Updated June 10, 2026
Site work for a water / sewer project in Hot Springs National Park, Arkansas. Completed plans call for site work for a water / sewer project.
The project is for drainage improvements and replacements as shown on the plans, including but not limited to: removal of 25’ of 42” concrete arch and 25’ of 36” RCP, removal of 70’ of twin 36” RCP, wall plug of 3’ x 5’ box culvert, installation of 55’ of 12’ x 3’ (inside pre-cast box culvert) (alternate 12’ x 3’ box); installation of 80’ of twin 36” RCP and 98’ of twin 36” CPP, 320’ of 24” RCP, 99’ of twin 18” RCP and 38’ of twin 18” CPP and 50’ of 12” RCP, installation of seven junction boxes, one curb inlet and one field basin, fence removal and replacements, riprap, street 8” concrete base and extra width removal for city asphalt paving, yard restoration and cleanup. Bidders must submit their bids by the stated deadline using any delivery method except electronic means (fax or e-mail). Bid documents can be obtained from the Engineer’s Office for a fee. Return of documents is not required and the fee is non-refundable. A performance and payment bond is required for contracts over $35,000. Bid security in the form of a cashier’s check or a corporate bid bond for five percent (5%) of the bid amount is required for bids over $35,000. Bids may not be withdrawn within 90 days of opening. Bidders must provide a certificate regarding Equal Employment Opportunity, as applicable, and comply with all laws and regulations. Conditional bids may be rejected. Contractors must comply with City Codes and subcontractors are subject to City approval. Bidders are expected to inspect the work site. Disadvantaged, small, minority, and woman-owned business enterprises are encouraged to participate, and certification is required for recognition. The City reserves the right to reject any or all bids and to waive formalities in the City’s best interest.
GC Bidding
Water / Sewer
$400,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 29, 2026
August 13, 2026
To be determined, Hot Springs National Park, AR
Related To This Project
Hot Springs National Park, AR
Bid Date: Jun 29 2026
Hot Springs National Park, AR
Bid Date: Jun 29 2026
Hot Springs National Park, AR
Bid Date: Jun 29 2026
Hot Springs National Park, AR
Bid Date: Jun 25 2026
Hot Springs National Park, AR
Bid Date: Jun 19 2026
Hot Springs National Park, AR
Bid Date: Jun 24 2026
Hot Springs National Park, AR
Bid Date: Jun 03 2026
Hot Springs National Park, AR
Bid Date: May 22 2026
Hot Springs National Park, AR
Bid Date: Apr 20 2026
Hot Springs National Park, AR
Bid Date: May 15 2026
Hot Springs National Park, AR
Bid Date: May 22 2026
Hot Springs National Park, AR
--
Hot Springs National Park, AR
--
Hot Springs National Park, AR
Bid Date: Apr 27 2026
Hot Springs National Park, AR
Bid Date: May 11 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
