Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 8, 2026 at 8:00 PM
Updated June 10, 2026
Site work and paving for a mixed-use development in New Century, Kansas. Completed plans call for site work for a transportation facility; and transportation facility.
All materials, labor, equipment, supervision, and incidentals necessary to reconstruct Runway 18/36 at the Johnson County New Century AirCenter (IXD). Work includes site preparation involving approximately 122,210 CY of excavation and 8,052 CY of off-site borrow; installation of approximately 158,500 SY combined aggregate base course and 147,000 SY of PCC pavement; 177,200 SF of pavement marking; and drainage improvements. The project also includes installation of approximately 113,200 LF combined electrical cabling, new signage, and 100 acres of seeding and mulching. Alternative work, if approved, will include: (1) constructing a new run-up apron for Runway 36 with installation of approximately 5,700 SY of aggregate base course, 5,600 SY of PCC pavement, 2,300 SF of pavement marking, and 1,700 LF combined electrical cabling; (2) rehabilitating Taxiway L lighting with approximately 9,210 combined electrical cabling and new signage; and (3) seal coat Taxiway A and F with installation of approximately 80,000 SY of asphalt surface treatment and 24,500 SF of pavement marking. Sealed bids must be submitted electronically. Bidders shall submit with their bid a bid bond issued by a surety company licensed to do business in the State of Kansas in the amount of five percent (5.0%) of the total amount of their bid. The Owner's award of this contract is conditioned upon Bidder satisfying the good faith effort requirements of the U.S. Department of Transportation (DOT), 49 CFR 26.53. The Disadvantaged Business Enterprise (DBE) goal for this project has been established at 0.0%. Compliance with the DBE goal is a mandatory part of the bidding process. This contract is subject to the "Buy American Preferences" of the Aviation Safety and Capacity Act of 1990. As a condition of bid responsiveness, Bidders must complete and submit as part of their response the enclosed Buy American certification. Bidders shall submit evidence of competence to perform the Work in the form provided in the Bidding Documents, or in a substantially similar form containing the same requested information. The Contractor is required to comply with wage and labor provisions and to pay minimum wages in accordance with the current schedule of wage rates established by the United States Department of Labor. No bid may be withdrawn within a period of ninety (90) days from the date of the bid opening.
GC Bidding
Transportation Terminals
$25,000,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 7, 2026
August 21, 2026
1 New Century Parkway, New Century, KS
Related To This Project
New Century, KS
Bid Date: Jun 18 2026
New Century, KS
Bid Date: May 12 2026
New Century, KS
Bid Date: May 14 2026
New Century, KS
Bid Date: Dec 24 2025
New Century, KS
Bid Date: Dec 19 2025
New Century, KS
Bid Date: Dec 23 2025
New Century, KS
Bid Date: Dec 23 2025
New Century, KS
Bid Date: Aug 28 2025
New Century, KS
Bid Date: Aug 21 2025
New Century, KS
Bid Date: Jul 16 2025
New Century, KS
Bid Date: May 29 2025
New Century, KS
--
New Century, KS
Bid Date: Oct 28 2024
New Century, KS
Bid Date: Sep 30 2024
New Century, KS
Bid Date: Sep 27 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
