BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 11, 2026

Demolition, site work, paving and addition to a military facility in Kapolei, Hawaii. Conceptual plans call for the addition of a military facility; for the demolition of a military facility; for site work for a military facility; and for paving for a military facility.

Construction of a new Munitions Maintenance and Inspection facility and an addition to an existing Conventional Munitions Cube Storage facility using conventional design and construction methods to support munitions handling and F-22 mission requirements. Work includes micro-pile foundations to address soil and seismic conditions; cast-in-place concrete slabs, walls, and structural masonry; cold-formed metal framing, insulated metal wall panels, and structural steel systems; and installation of standing seam metal roofing with gutters, downspouts, and weather barriers. The project incorporates specialized mechanical, HVAC, plumbing, lightning grounding, communication infrastructure, and complete fire alarm and sprinkler systems. A bid option includes construction of a concrete Material Assembly Center pad and associated asphalt paving for facility access. The storage addition includes high-hazard concrete wall construction, structural steel framing, roofing tied to existing standards, new adjacent asphalt pavement, and integrated fire detection and reporting systems connected to base systems. Work also requires temporary security fencing, controlled access and escort coordination, integration with existing utilities without interrupting operations, environmental coordination for hazardous materials, and restoration of any damaged facilities, with execution in an island environment requiring logistical and technical capability. Location: Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii 96853, USA The Method of Contractor Selection has not been determined at this Time. The magnitude of this project(s) (combined) is between $10,000,000 and $25,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Military

$25,000,000.00

Public - Federal

Addition, Demolition, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
45
Bidding Soon
366
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2027

Project location map

To Be Determined, Kapolei, HI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.