Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 9, 2026 at 8:00 PM
Updated June 11, 2026
Demolition, site work, paving and addition to a military facility in Kapolei, Hawaii. Conceptual plans call for the addition of a military facility; for the demolition of a military facility; for site work for a military facility; and for paving for a military facility.
Construction of a new Munitions Maintenance and Inspection facility and an addition to an existing Conventional Munitions Cube Storage facility using conventional design and construction methods to support munitions handling and F-22 mission requirements. Work includes micro-pile foundations to address soil and seismic conditions; cast-in-place concrete slabs, walls, and structural masonry; cold-formed metal framing, insulated metal wall panels, and structural steel systems; and installation of standing seam metal roofing with gutters, downspouts, and weather barriers. The project incorporates specialized mechanical, HVAC, plumbing, lightning grounding, communication infrastructure, and complete fire alarm and sprinkler systems. A bid option includes construction of a concrete Material Assembly Center pad and associated asphalt paving for facility access. The storage addition includes high-hazard concrete wall construction, structural steel framing, roofing tied to existing standards, new adjacent asphalt pavement, and integrated fire detection and reporting systems connected to base systems. Work also requires temporary security fencing, controlled access and escort coordination, integration with existing utilities without interrupting operations, environmental coordination for hazardous materials, and restoration of any damaged facilities, with execution in an island environment requiring logistical and technical capability. Location: Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii 96853, USA The Method of Contractor Selection has not been determined at this Time. The magnitude of this project(s) (combined) is between $10,000,000 and $25,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Military
$25,000,000.00
Public - Federal
Addition, Demolition, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 7, 2027
To Be Determined, Kapolei, HI
Related To This Project
Kapolei, HI
--
Kapolei, HI
Bid Date: Jun 19 2026
Kapolei, HI
Bid Date: May 29 2026
Kapolei, HI
Bid Date: Jun 02 2026
Kapolei, HI
Bid Date: May 29 2026
Kapolei, HI
Bid Date: May 12 2026
Kapolei, HI
Bid Date: Apr 10 2026
Kapolei, HI
Bid Date: Apr 30 2026
Kapolei, HI
Bid Date: Mar 24 2026
Kapolei, HI
--
Kapolei, HI
Bid Date: Mar 05 2026
Kapolei, HI
Bid Date: Feb 26 2026
Kapolei, HI
--
Kapolei, HI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
