BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 10, 2026

Renovation of a civil project in Appleton, Wisconsin. Completed plans call for the renovation of a water / sewer project; and bridge / tunnel.

The work consists of demolishing drywall and the associated drywall framing on the east and west M-K tunnel bridge walls, cleaning and painting of the existing interior bridge structural steel framing and insulated metal wall panels, painting the existing drywall ceiling, and painting the existing north wall of the M-K tunnel bridge. Other items as described in the Bidding Documents for the Wastewater Treatment Plant L Building HVAC and Miscellaneous Upgrades Project are included as well. Only electronic bids will be accepted through the specified online service. Interested parties must register and purchase the digital contract documents to be plan holders. Forms for the "Bidders Proof of Responsibility" must be filed with the City Clerk at least five days before bid opening. A performance bond/labor and material payment bond equal to 100% of the contract is required. Each bid must be accompanied by a bid bond equal to five percent of the bid as a guarantee. The City reserves the right to reject any and all bids or to accept any bid deemed in the best interests of the City and to waive any informalities in the bidding.

GC Bidding

Water / Sewer

$400,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
86
Bidding Soon
1,211
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2026

August 7, 2026

Project location map

2006 E Newberry Street, Appleton, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.