Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 23, 2026 at 8:00 PM
Updated July 7, 2026
Site work and renovation of a water / sewer project in Marietta, Georgia. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
The project consists of the removal and replacement of the ultraviolet (UV) disinfection systems at three of the Cobb County Water System's water reclamation facilities (WRF) - the Noonday Creek WRF (20 MGD), the Northwest Cobb WRF (12 MGD), and the R.L. Sutton WRF (50 MGD). In addition, the project consists of the following major elements: replacement of gates and valves and their associated actuators; electrical, instrumentation, and HVAC upgrades; and the addition of a pre-engineered metal building to enclose the UV units at the R.L. Sutton WRF. Written questions must be received by Tuesday June 16, 2026, C.O.B. Questions regarding the location of or directions to the pre-bid meeting may be addressed to Steven Nestor, Cobb County Water System at (770) 419-6321 and/or steven.nestor@cobbcounty.gov. Project No. 9916.01, 2025-255-00, 25-163, 25028 Scope of work and project location is as follows Location 1: Noonday WRF, 415 Shallowford Road, NE, Kennesaw, GA 30144 The Project includes the removal and replacement of eight (8) inline ultraviolet (UV) disinfection units and associated electrical and control equipment, removal and replacement of sixteen (16) motorized butterfly valves, removal and replacement of HVAC equipment. Location 2: Northwest Cobb WRF, 3740 Old 41 Hwy, Kennesaw, GA 30144 The Project includes the removal and replacement of three (3) ultraviolet (UV) disinfection channel units and associated electrical and control equipment, removal and replacement of three (3) motorized slide gates, and removal and replacement of HVAC equipment Location 3: RL Sutton WRF, 5175 South Atlanta Road, Atlanta, GA 30339. The Project includes the removal and replacement of fourteen (14) inline ultraviolet (UV) disinfection units and associated electrical and control equipment, removal and replacement of twenty-eight (28) motorized butterfly valves, removal and replacement of HVAC equipment, and new pre-engineered metal building around the existing UV room canopy. Question Deadline 06/16/2026
Post-Bid
Water / Sewer
$3,000,000.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 25, 2026
July 27, 2026
Multiple Locations, Marietta, GA
Related To This Project
Marietta, GA
Bid Date: Jun 30 2026
Marietta, GA
Bid Date: Jul 09 2026
Marietta, GA
Bid Date: Jun 25 2026
Marietta, GA
Bid Date: Jul 23 2026
Marietta, GA
Bid Date: Jul 23 2026
Marietta, GA
Bid Date: Jul 23 2026
Marietta, GA
Bid Date: Jul 23 2026
Marietta, GA
--
Marietta, GA
--
Marietta, GA
--
Marietta, GA
Bid Date: Jul 01 2026
Marietta, GA
--
Marietta, GA
Bid Date: Jul 08 2026
Marietta, GA
--
Marietta, GA
Bid Date: Jun 23 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
