BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 23, 2026 at 8:00 PM

Updated July 7, 2026

Site work and renovation of a water / sewer project in Marietta, Georgia. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The project consists of the removal and replacement of the ultraviolet (UV) disinfection systems at three of the Cobb County Water System's water reclamation facilities (WRF) - the Noonday Creek WRF (20 MGD), the Northwest Cobb WRF (12 MGD), and the R.L. Sutton WRF (50 MGD). In addition, the project consists of the following major elements: replacement of gates and valves and their associated actuators; electrical, instrumentation, and HVAC upgrades; and the addition of a pre-engineered metal building to enclose the UV units at the R.L. Sutton WRF. Written questions must be received by Tuesday June 16, 2026, C.O.B. Questions regarding the location of or directions to the pre-bid meeting may be addressed to Steven Nestor, Cobb County Water System at (770) 419-6321 and/or steven.nestor@cobbcounty.gov. Project No. 9916.01, 2025-255-00, 25-163, 25028 Scope of work and project location is as follows Location 1: Noonday WRF, 415 Shallowford Road, NE, Kennesaw, GA 30144 The Project includes the removal and replacement of eight (8) inline ultraviolet (UV) disinfection units and associated electrical and control equipment, removal and replacement of sixteen (16) motorized butterfly valves, removal and replacement of HVAC equipment. Location 2: Northwest Cobb WRF, 3740 Old 41 Hwy, Kennesaw, GA 30144 The Project includes the removal and replacement of three (3) ultraviolet (UV) disinfection channel units and associated electrical and control equipment, removal and replacement of three (3) motorized slide gates, and removal and replacement of HVAC equipment Location 3: RL Sutton WRF, 5175 South Atlanta Road, Atlanta, GA 30339. The Project includes the removal and replacement of fourteen (14) inline ultraviolet (UV) disinfection units and associated electrical and control equipment, removal and replacement of twenty-eight (28) motorized butterfly valves, removal and replacement of HVAC equipment, and new pre-engineered metal building around the existing UV room canopy. Question Deadline 06/16/2026

Post-Bid

Water / Sewer

$3,000,000.00

Public - County

Renovation, Site Work

1

1

24

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
368
Active Projects
145
Bidding Soon
2,067
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2026

July 27, 2026

Project location map

Multiple Locations, Marietta, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.