BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 4, 2026 at 8:00 PM

Updated August 9, 2026

Site work and paving for a road / highway in Eagle River, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work includes unclassified excavation, pulverizing existing pavement and base, placing crushed aggregate base course, installing asphaltic concrete pavement, furnishing and installing recycled asphalt, sawcutting asphalt pavement, installing silt fence, and turf restoration. Proposals must be accompanied by bid security in the form of a certified check or electronic bid bond in an amount of 5% of the maximum bid price. No bidder may withdraw their bid within 60 days after the opening. The Owner reserves the right to waive any informalities or reject any or all bids. Question Deadline 06/18/2026 Contact information and submittal procedures for such questions are as follows: A. MSA Professional Services 1835 N Stevens Street Rhinelander, WI 54501 Jeff Seamandel, Project Manager 715-362-3244 | jseamandel@msa-ps.com 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Award

Roads / Highways

$274,223.00

Public - City

Paving, Site Work

27

16

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
24
Bidding Soon
325
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2026

July 27, 2026

Project location map

Multiple Locations, Eagle River, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.