BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 20, 2026 at 8:00 PM

Updated July 26, 2026

Demolition, site work, paving and new construction of a civil project in Tarkio, Missouri. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the construction of a bridge / tunnel; for the demolition of a bridge / tunnel; road / highway; and road / highway.

Demolition of an existing bridge and the construction of a new 153-ft three span spread box beam bridge. Guardrail, riprap and permanent erosion control will be installed along with any other incidental work in accordance with plans and specifications. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2026, First Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. The Atchison County Commission reserves the right to reject any or all bids. MODOT - X Avenue Bridge Replacement All questions about the meaning or intent of the contract documents shall be submitted to the Design Professional in writing. Question Deadline 07/10/2026 All questions concerning this project during the bidding process shall be forwarded to the project contact listed below: Name Matt Fazio Address 908 Broadway Boulevard, Kansas City, MO 64105 Phone Number 816-300-4855 Email Address mfazio@greatriv.com

Bid Results

Bridges / Tunnels

$1,368,246.00

Public - County

Demolition, New Construction, Paving, Site Work

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
41
Bidding Soon
795
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2026

August 17, 2026

Project location map

X Ave, Tarkio, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.