Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 10, 2026 at 8:00 PM
Updated June 11, 2026
Renovation of a mixed-use development in Quebec, Quebec. Completed plans call for the renovation of a educational facility.
Reference number: 20151523 Deadline for receipt of complaints 2026-06-23 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 12 Value of the Tender guarantee (amount or percentage) 10% Description The Centre de services scolaire des Premieres-Seigneuries wishes to retain the services of a construction contractor for the repair and redevelopment of premises 850 at 900, rue de la Sorbonne, Quebec G1H 1H1. Refer to the tender documents for the date of the non-mandatory visit. The main works related to this project are: Main works but not limited to: . General Contractor o Coordination of work o Demolition and drillings for the transition of the mechanics to asbestos or not o Demolition of existing partitions and suspended ceilings o Interior painting work. o Protection, movement, and storage of goods and furniture o Interior systems work o Carpentry o Carpentry work o Doors and hardware o Safety management on the construction site o Masonry o Excavation o Windows o Etc. . In plumbing/heating: o Plumbing/heating demolition work. o Temporary for sanitary and storm drainage. o Drainage under slab. o Various plumbing works (new bathrooms). o Insulation work on plumbing/heating pipes. o Etc. . In ventilation: o Demolition work in ventilation. o Exhaust/ air treatment systems. o Demolition of conduits. o Install the air ducts. o Installation of a dust collector system. o Insulation work on ventilation ducts. o Etc. . In regulation: o Remove and recover the control points of the removed mechanical equipment. o Remove any unused control wiring. o Take control of the new equipment installed as part of this project and integrate it into the school's existing control sequences. o Place the charts on the servers of the school service center o Programming of new sequences controls new equipment. o Etc. . In electricity o Relocation of mechanical/electrical equipment. o Connection of new mechanical equipment. o Lighting work. o Dismantling. o Removal of power supply from unused equipment. o Replacement of some heating equipment. o Etc. . Structure: o Demolition of slab and concrete block. o New concrete slab with asphalt membrane. o Polishing. o Structural reinforcement work. o Etc. Delivery schedule Start of the work: August 3, 2026 End of the work: March 1, 2027 Completion schedule: Clarification on the work schedule: . PHASE 1 Summer period - August 3 to 28, 2026 o Daytime work permitted in sector E and partially in sector C. Concrete slab demolition work and the installation of temporary storm and sanitary drainage (sector E), the repair of the concrete slab on the ground floor (sector C), as well as the temporary emergency exits on the ground floor must be completed before the start of the second phase. . PHASE 2 School term (August 29, 2026 to November 27, 2026) Daytime work will be allowed in sector E (except for very noisy work such as sawing and breaking concrete, etc.) o Noisy work can be carried out during evenings and nights. o Acceptance of the work on sector E no later than 20 November 2026. . PHASE 3 temporary stoppage of the construction site (December 1-18, 2026) o Relocation from sector C to sector E by the school service center. . PHASE 4 School term (January 5, 2027 to March 1, 2027) o Day work permitted, demolition and construction of sector C. o Acceptance of Sector C work by 22 February 2027.
GC Bidding
Educational
$500,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 7, 2026
August 3, 2026
900 Rue de la Sorbonne, Quebec, QC
Related To This Project
Quebec, QC
Bid Date: Jun 29 2026
Quebec, QC
Bid Date: Jun 17 2026
Quebec, QC
Bid Date: Jun 22 2026
Quebec, QC
Bid Date: Jun 25 2026
Quebec, QC
Bid Date: Jun 29 2026
Quebec, QC
Bid Date: Jul 06 2026
Quebec, QC
Bid Date: Jun 22 2026
Quebec, QC
Bid Date: Jul 06 2026
Quebec, QC
Bid Date: Jun 30 2026
Quebec, QC
Bid Date: Jul 07 2026
Quebec, QC
Bid Date: Jul 02 2026
Quebec, QC
Bid Date: Jun 23 2026
Quebec, QC
Bid Date: Jun 30 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
