BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 10, 2026

Demolition, site work and new construction of a bridge / tunnel in Fort Atkinson, Wisconsin. Completed plans call for the construction of a bridge / tunnel; for the demolition of a bridge / tunnel; and for site work for a bridge / tunnel.

The Jefferson County Parks Department seeks proposals for the purchase and installation of a 45’ x 12’ snowmobile bridge. Specifications require a 25,000# load, MCA treated Southern Yellow Pine deck boards (pre-stained and attached with all fasteners rated for MCA treated wood), galvanized or equivalent hardware, a 42” horizontal railing, and submission of two sets of stamped engineered drawings. The project includes the use of 6 yards of fill at each bridge end for ramps (12 total yards of spoils and gravel material). Bidders must include costs for delivery and installation and provide a separate line item for removal and disposal of the old bridge and any spoils. The bridge kit includes all steel I-beams and crossmembers (predrilled, with red oxide primer), MCA Southern Yellow Pine treated lumber, and all hardware, meeting WI DNR guidelines for a 25,000# load. The project must be completed by October 31, 2026. All sealed bids must be received no later than 1:00 PM on Wednesday June 24th. Contractors must schedule the project at least two weeks in advance and, once started, complete the installation within two weeks. The County will pay the agreed price upon project completion.Questions Due 6/19/26

GC Bidding

Bridges / Tunnels

$70,000.00

Public - County

Demolition, New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
500
Active Projects
282
Bidding Soon
4,441
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2026

July 15, 2026

Project location map

N2775 County Road J, Fort Atkinson, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.