BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 6, 2026 at 8:00 PM

Updated July 20, 2026

Renovation of an educational facility in Thomasville, North Carolina. Completed plans call for the renovation of a educational facility.

This project will replace two aging packaged DX, cooling only, rooftop unit (RTU), which serve the entire Mendenhall Building, with like-new replacements. This project will also include control scope by the contractor including new equipment controls, reconnection to existing terminal unit controls, and replacement of controls wiring between RTUs and existing Tridium JACE based BAS panel. The owner reserves the right to reject any or all bids and to waive informalities. Bid RFIs Due 06/23/26 @ 10:00AM By Email: jcurrie@cmta.com, cltadmin@cmta.com, kraker4708@davidsondavie.edu

Post-Bid

Educational

$200,000.00

Public - County

Renovation

10

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
289
Active Projects
128
Bidding Soon
2,000
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2026

July 30, 2026

Project location map

297 Davidson Community College Rd, Thomasville, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.