Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 10, 2026 at 8:00 PM
Updated June 10, 2026
Site work for a road / highway in Tallahassee, Florida. Completed plans call for site work for a road / highway.
Limits: 60010000 Total Roadway Length: 0.0 Miles Contract Days: 820 Total Bridge Length: 0.0 Miles Total Proposal Length: 0.0 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Days Flexible Description: The improvements under this District Contract consists of providing the labor, material, and equipment necessary to complete the landscaping project located along SR 10 (US 90) & SR 20 (Main St.) Park and Ride Landscaping in Walton County. Details of this project are shown in the Contract Plans. A total of 90 Contract days will be allowed for the installation period, and 730 Contract days will be allowed for the establishment period. This is a Lump Sum Contract with only one pay item listed in the Contract. All references to payment under individual pay item numbers, regardless of where those references are contained in the Contract Documents or when in time any such pay item reference is incorporated in the Contract Documents, are superseded by the pay item references in this Special Provision. Payment for all work in this Contract will be made under: Item No. 999-2 Lump Sum Contract - LS. Pay adjustments as shown in the Contract Documents, regardless of where those pay adjustments are referenced, shall not apply, except as provided for in 9-2 Scope of Payments. Experience in Landscaping form 850-070-09 is required to be submitted with bid. Prequalification per Rule 14-22 is not required. Question Deadline 07/02/2026 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 002 - Landscaping - SR 10 (US 90) & SR 20 (Main St.)
Sub-Bidding
Roads / Highways
$194,481.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2026
July 20, 2026
US-90 & FL-20, Tallahassee, FL
Related To This Project
Tallahassee, FL
Bid Date: Jun 23 2026
Tallahassee, FL
--
Tallahassee, FL
Bid Date: Jul 02 2026
Tallahassee, FL
Bid Date: Jul 09 2026
Tallahassee, FL
Bid Date: Jul 14 2026
Tallahassee, FL
Bid Date: Jul 13 2026
Tallahassee, FL
--
Tallahassee, FL
Bid Date: Jul 01 2026
Tallahassee, FL
Bid Date: Jul 09 2026
Tallahassee, FL
--
Tallahassee, FL
--
Tallahassee, FL
--
Tallahassee, FL
--
Tallahassee, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
