Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 7, 2026 at 8:00 PM
Updated July 13, 2026
Demolition and site work for a residential development in Ware, Massachusetts. Completed plans call for the demolition of a residential development; and for site work for a residential development.
Contractor Qualification DCAMM Certificate Demolition Services for 92-104 Main Street, Ware, MA. Questions regarding the project specifications and general questions about the project should be directed to Anna Marques, Building Commissioner, Town of Ware, 413-967-9648 x114 or Town Manager, Stuart Beckley at 413-967-9648 x100. The Town of Ware invites bids from qualified demolition vendors for the complete demolition of two structures as required and the removal of all contents and debris found indoors and outdoors on the two parcels. The site of the two properties shall be restored to a smooth surface condition. The awarded vendor shall obtain all permits and licenses to complete this work with the Town of Ware and all other applicable agencies and conform to all local, state and federal regulations. The two properties are: Two story, mixed use building with basement: 92 Main Street (Parcel ID 61-3-1) Two story, mixed use building with basement: 104 Main Street (Parcel ID 61-0-3) Scope of work to include: 1) Notification to Dig Safe. 2) Verification of disconnection of all services. 3) Disconnection, cutting, and capping off of existing utility services as directed by the Town of Ware. Services are currently shut off. Services are to be capped within the property line. 4) Obtaining a Building Permit for demolition with all requirements. All fees will be waived. 5) Access to the inside of the building for hazardous material testing is not possible due to safety concerns and the structures have been formally condemned by the Town. At this time, all structures are unsafe, therefore materials should be considered "hot materials". See attached Pre-Demolition Hazardous Building Materials Survey Report, Dated 04/29/2026, prepared by Forbes & Wheeler, Inc. 6) Providing and install any protective fencing during the project that may be necessary to protect the public and adjacent buildings from the area until the project is complete. There is no Sidewalk Occupancy Permit application or fee for the Town of Ware. 7) Demolition of the structures known as 92-104 Main St, including appropriate removal of all debris (from structure demolition and from entire contents found on parcels) to approved facilities. At this time, all material is to be considered "hot". 8) Removal of any concrete and foundation of 92-104 Main Street. 9) Fill and grade site with clean fill. Provide slant grading for drainage. 10) Provide a seed mixture to stabilize any disturbed area with loose soil, or other acceptable methods. 11) Providing water for dust control. Town hydrant may be used and contractors will be exempt from water usage fees by installing a meter provided by the Town Water Department. 12) Coordination with the Town of Ware on allowed use of the adjacent lot for logistical staging during demolition. There is a parcel of land between the subject parcels and Niko's Pizza that is the same owner as the project site, therefore access will be available if needed. 13) Sidewalks shall be left in a safe condition with compacted gravel if damaged. 14) Coordination with the Town of Ware Police Department for Police Detail Service as required during working hours. Town of Ware shall provide: 1) Service Disconnection charges and Permit fees 2) Repair work to damaged underground services not identified by Dig Safe or Town of Ware 3) Removal of any underground tanks, if discovered 4) Submit a non-traditional work plan to MassDEP by a Town funded Consultant 5) The Town will retain the asbestos project monitor services.
Award
Residential Subdivision
$332,996.00
Public - City
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 25, 2026
July 27, 2026
92 E Main St, Ware, MA
Related To This Project
Ware, MA
Bid Date: Aug 14 2026
Ware, MA
Bid Date: Aug 20 2026
Ware, MA
Bid Date: Aug 21 2026
Ware, MA
Bid Date: Jun 10 2026
Ware, MA
Bid Date: Apr 28 2026
Ware, MA
Bid Date: Jun 05 2026
Ware, MA
Bid Date: May 22 2026
Ware, MA
Bid Date: Mar 11 2026
Ware, MA
--
Ware, MA
Bid Date: Jun 23 2026
Ware, MA
Bid Date: May 28 2026
Ware, MA
Bid Date: Dec 16 2025
Ware, MA
Bid Date: Apr 23 2026
Ware, MA
Bid Date: Nov 19 2025
Ware, MA
Bid Date: Nov 19 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
