BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 15, 2026 at 8:00 PM

Updated July 20, 2026

Site work for a sidewalk / parking lot in Saluda, South Carolina. Completed plans call for site work for a 4,200-square-foot sidewalk / parking lot.

The town is seeking asphalt paving of the parking lot located at 102 S. Jefferson Street, Saluda, SC 29138. Alternative A involves paving the area highlighted in yellow on the attached map, consisting of approximately 3,300 square feet. Alternative A & B involves paving both areas A and B, with a combined total of approximately 4,200 square feet. 1.The contractor shall use materials and applications approved and specified by State, and Municipal authorities. The contractor shall take all reasonable actions to protect private and public areas, as well as the public. 2. Remove all car stops, clean and re-use undamaged car stops. Replace any damaged car stops. 3. Mill existing asphalt to an appropriate depth to provide proper drainage, an even surface for repaving, and leveling, as necessary. 4. Area to be resurfaced shall be thoroughly cleaned, and tack coated, with properly cured emulsified asphalt before placement of the asphalt overlay. All vertical edges abutting the asphalt edges should be tack coated. 5. Pave with 1.5" hot mix asphalt. Surface shall be smooth, consistent, and uniform density, and the surface and surface slopes shall be established or maintained to provide acceptable storm water drainage. 6. Re-install car stops. 7. Stripe with SCDOT traffic marking paint parking spaces, and handicap space in accordance with ADA code as they were painted prior to resurfacing. 8. All excavated pavement, debris, and other waste materials shall be removed from the site and disposed of legally by the contractor. 9. All work and materials shall comply with applicable State, and Municipal codes and standards. 10. Project Completion Date: Except when weather conditions make completion date impossible, awarded project is to be completed on or before September 30, 2026. Contractor's proposals should include tentative completion dates. A penalty of $250 payable to the Town will be imposed every day the project continues after September 30, 2026. 11. Contractor shall warranty application and workmanship for asphalt overlay and restriping/re-painting: 1) Asphalt overlay shall be warranted from traveling, potholes, and alligator Ing for minimum of 1-yearfrom date of completion. 2) Re-striping/re-painting shall be warranted from washing-off and/or peeling-off and/or abnormal wearing-off for 1 -year from date of completion. 12. The paved area shall also confirm the following: 1) Minimum 2% slope is recommended to prevent water accumulation and extend pavement life. 2) Parking Layout and Dimensions Stall Sizes: standard stalls are 9*17 feet plus one parking space designed to comply with ADA standards. Questions regarding this request for proposals should be directed in writing to: o Rich Caplan, Town Administrator o Town of Saluda o rcaplan@townofsaluda.gov o (864) 445-3522

Bid Results

Sidewalks / Parking Lot

$21,750.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
91
Bidding Soon
1,296
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2026

August 14, 2026

Project location map

102 S Jefferson St, Saluda, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.