BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2026 at 8:00 PM

Updated June 12, 2026

Renovation of an educational facility in Amherst, Massachusetts. Completed plans call for the renovation of a educational facility.

Totman Simulation Suite & Bioprocessing Lab: Create a new Simulation Suite, Anthropometry space, and bioprocessing lab for SPHHS (School of Public Health & Health Sciences). Plumbing, Electrical work, HVAC Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.

GC Bidding

Educational

$1,400,000.00

Public - State/Provincial

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
940
Active Projects
524
Bidding Soon
6,299
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2026

September 24, 2026

Project location map

To Be Determined, Amherst, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.