Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 9, 2026 at 8:00 PM

Updated October 15, 2026

Renovation of a water / sewer project in St Petersburg, Florida. Working plans call for the renovation of a water / sewer project.

Project has been cancelled The work to be performed under these Contract Documents consists of the removal and replacement of two (2) 3200 ampere drawout generator circuit breakers and four (4) 1600 ampere drawout feeder circuit breakers in a 277/480 volt, 3-phase, 4-wire switchgear line-up, with a 6000 ampere main bus rating. The switchgear line-up and circuit breaker cells shall be reconditioned and modified, as required, for the new circuit breaker installations. The work shall also include the removal and replacement of the back panel and door in the free-standing, floor-mounted, generator/engine master control cabinet and the control components contained within this cabinet. Additionally, the doors, back panels and control components for the generator controls for Generator 3-1 and Generator 3-2, that are part of the switchgear line-up, shall be replaced. In conjunction with the work associated with the switchgear line-up described, the work requires the removal and replacement of two (2) switchboard line-ups (TPA and TPB), each including a utility circuit breaker, a generator circuit breaker, group-mounted devices and an automatic failover system. The installation work is located at the Pinellas County South Cross Bayou AWRF. The work shall be inclusive of all equipment, materials and work required for operational systems that are complete and fully tested. The Engine/Generator Controller CC3, Generator 3-1/3-2 switchgear line-up and switchgear line-ups TPA and TPB at the South Cross Bayou (SCB) AWRF are more than twenty years old. Replacement parts for this controller and the switchgear line-ups are becoming difficult to locate; and this equipment is reaching the end of its useful service life and is in need of replacement. The engine/generator controls and the switchgear line-ups are vital in maintaining operations at the South Cross Bayou AWRF. This equipment is essential to normal day-to-day operations and during times when utility power is lost. Step 1 Question Submission Deadline:August 21, 2026, 3:00pm Step 2 Bid Submission Deadline:September 8, 2026, 3:00pm

Final Planning

Water / Sewer

$300,000.00

Public - County

Renovation

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
128
Bidding Soon
1,793
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2026

October 9, 2026

Project location map

7401 54th Ave N, St Petersburg, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed