Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 13, 2026 at 8:00 PM
Updated July 15, 2026
Demolition, site work, paving and new construction of a bridge / tunnel in Clermont, Florida. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Pinellas County is replacing the Ridgemoor Boulevard Bridge over Brooker Creek. The current 120-foot flat-slab bridge will be replaced with a 135-foot structure along with related roadway and drainage improvements. This is a federally funded Local Agency Program (LAP) project administered through the Florida Department of Transportation (FDOT). 1 Question Submission Deadline:July 3, 2026, 3:00pm Step 1 Bid Qualification Submission Deadline:July 9, 2026, 3:00pm Step 2 Bid Submission Deadline:July 28, 2026, 3:00pm SOLICITATION MEETINGS: Site Visit: None; Pre-Conference: None
Post-Bid
Bridges / Tunnels
$9,000,000.00
Public - County
Demolition, New Construction, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 14, 2026
Multiple Locations, Clermont, FL
Related To This Project
Clermont, FL
--
Clermont, FL
--
Clermont, FL
--
Clermont, FL
--
Clermont, FL
Bid Date: Jul 07 2026
Clermont, FL
Bid Date: Jul 08 2026
Clermont, FL
Bid Date: Feb 15 2019
Clermont, FL
Bid Date: Jun 07 2021
Clermont, FL
Bid Date: Jun 04 2026
Clermont, FL
Bid Date: Jun 15 2026
Clermont, FL
Bid Date: Jun 03 2026
Clermont, FL
Bid Date: May 21 2026
Clermont, FL
--
Clermont, FL
Bid Date: Jun 30 2026
Clermont, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
