Published July 29, 2026 at 8:00 PM

Updated August 2, 2026

Demolition, site work, new construction and renovation of a mixed-use development in Dallas, Texas. Completed plans call for the construction of a power facility.

The project scope includes the installation of 3,100 LF of stainless-steel gas piping, pipe racks with 108 drilled shafts, instrumentation and gas analyzer systems, two electrical equipment pads with transformers and switchgear, 360 LF of duct bank, electrical conductors, fiber optic cabling, security cameras, various buried utilities (HDPE/PVC for gas, water, and sewer), and the demolition of abandoned structures followed by the construction of a replacement stormwater junction structure. Question Deadline 7/21/2026 5:00:00 PM CST DIRECT ALL QUESTIONS for this project only through online . Only responses issued via Addenda are binding. Estimate: $15M to $20M ** pre bid info : Prospective Bidders are reminded that all visitors attending the Site Visit MUST have work boots, hard hats, and safety vests. No exceptions. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project No. TR121490 Pipe rack and related structural supports for the above-grade pipe routing; this will include installation of approximately 108 3-ft diameter drilled shafts to provide the foundation for the pipe rack. Instrumentation including gas flow meters, pressure transmitters, oxygen sensors, methane transmitters and temperature transmitters, and associated control connections, as well as installation of a mass spec gas analyzer system. Construction of a 40 ft x 22 ft electrical equipment pad and installation of an electrical transformer and switchgear (pre-procured separately and provided by the Owner), as well as construction of a separate 8 ft x 12 ft switchgear pad and installation of an additional switchgear to be furnished and installed under this project. Approximately 360 LF of duct bank (new) and installation of approximately 3,000 LF electrical conductors in total to be pulled through existing and new duct bank. Installation of a PLC and an interface panel on the pad alongside the transformer and installation and routing of approximately 1,800 LF of associated fiber optic cable, to be run along the abovegrade pipe rack. Also, separate installation of two security cameras to be mounted on the abovegrade pipe rack, and an additional approximately 1,700 LF of associated fiber optic cable. (Total of approximately 3,500 LF of fiber optic cable between both applications). Buried utilities, including approximately 770 LF of 6-inch HDPE natural gas piping and minor associated above-grade carbon steel connections , approximately 740 LF of PVC piping for plant service water in sizes ranging from 1 -inch to 12-inch, approximately 150 LF of 3-inch HDPE potable water piping, approximately 760 LF of 8-inch PVC gravity plant sewer, approximately 200 LF of 4-inch PVC gravity plant sewer, and approximately 144 LF of 4-inch PVC forced sewer, and installation of all valves, fittings, and appurtenances as required. Demolition of several abandoned structures and construction of a stormwater junction structure as replacement to one of the demolished structures

Post-Bid

Water / Sewer

$20,000,000.00

Public - State/Provincial

Demolition, New Construction, Renovation, Site Work

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
472
Active Projects
187
Bidding Soon
4,476
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.