BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 24, 2026 at 8:00 PM

Updated July 8, 2026

Demolition, site work and renovation of a medical facility in San Diego, California. Completed plans call for the renovation of a medical facility; for the demolition of a medical facility; and for site work for a medical facility.

Replacement of imaging equipment and infrastructure, including demolition of casework, plumbing modifications, concrete slab cutting and footing installation, electrical upgrades, installation of new partitions, cabinetry, radiation shielding patches, and interior finishes. Bonds: 10% Bid Bond. Project Description: Project to be executed at 9300 Campus Point Dr, La Jolla, CA 92037, Thornton Pavilion 1st Floor Radiology Department, Room 1-060, 1-062,1-063, consisting on the replacement of pre-existing imaging equipment and infrastructure components. In room 1-060 control booth, removal of existing fixed counter and built-in wall casework. In room 1-062 staging area, removal of Med Gasses on west wall, removal of existing built-in casework and hand washing sink, modifying the plumbing to eliminate foot pedal hot and cold water control valves, and demolition/finish of wall to control room, per plan. In room 1-063 procedure room, installation of a new GE ALLIA IGS740 System, including: demolition of a section of the existing concrete slab, a new thickened concrete footing to support new imaging modality and placing of equipment], trenching to create new underground pathways supporting power and signal cabling for the new modality, minor electrical scope to implement upgrades needed to adapt existing infrastructure to the new imaging modality requirements, add more power and data outlets to the control booth area, and procedure room, and upgrade the existing light fixtures, minor modifications and patching to the existing in-wall radiation shielding, to accommodate new wall mounted electrical components, Installation of new partition wall, access doors, and finishes to match between control room and procedure area. Removal of wall- mounted roll-up cabinetry along the south wall of suite, and installation of new Innerspace roll-up cabinetry. Work to include demolition of storage units above cabinets and installation of new vertical soffit per architectural design. Installation of new room finishes to include, new sheet vinyl flooring and baseboard, new wall paint, new wall and protection. The project has been designed and planned to be executed in one single effort, no phasing plan. UC San Diego maps can be found at http://maps.ucsd.edu. Attendees should plan to arrive in ample time to secure parking prior to the scheduled meeting time.

GC Bidding

Medical

$1,000,000.00

Public - State/Provincial

Demolition, Renovation, Site Work

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
307
Active Projects
37
Bidding Soon
1,990
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.