BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 14, 2026 at 8:00 PM

Updated September 18, 2026

Demolition, site work, paving and new construction of a laboratory facility in San Diego, California. Completed plans call for the construction of a 120,000-square-foot, five-story above grade laboratory facility.

Science building on the University (SDSU) Mission Valley campus. Approximate planned square footage of the project is 100,000-120,000 GSF above planned finished grade. TIMELINE: As of September 11, 2026, the project was awarded using a Design-Build delivery method. Construction is currently anticipated to begin in mid-2028. A final project schedule has not yet been released.

Award

Laboratories

$247,442,667.00

Public - City

Demolition, New Construction, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
279
Active Projects
113
Bidding Soon
1,495
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2026

June 7, 2028

Project location map

1313 Park Blvd, San Diego, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.