BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 25, 2026 at 8:00 PM

Updated July 7, 2026

Demolition, site work, paving and renovation of a sidewalk / parking lot in Chillicothe, Illinois. Completed plans call for site work for a sidewalk / parking lot; for the renovation of a sidewalk / parking lot; for the demolition of a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Removal and replacement of existing concrete sidewalks to meet current ADA compliance standards. Bonds: 5% Bid Bond, Certified Check required. All questions about the meaning of intent of the Contract Documents shall be submitted to Fehr Graham Engineering and Environmental, 140 East Washington Street, East Peoria, Illinois, 61611, in writing. Questions received less than five days prior to the date for opening of the PROPOSALS will not be answered.

Post-Bid

Sidewalks / Parking Lot

$1,500,000.00

Public - City

Demolition, Paving, Renovation, Site Work

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
8
Bidding Soon
1,914
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2026

July 14, 2026

Project location map

908 N. Second Street, Chillicothe, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.