BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 30, 2026 at 8:00 PM

Updated July 8, 2026

Demolition, site work, remodeling and addition to an educational facility in Missoula, Montana. Completed plans call for the addition of a 6,040-square-foot, one-story above grade educational facility; for site work for a educational facility; for the demolition of a educational facility; and for the remodel of a 1,270-square-foot, two-story above grade educational facility.

Work consists of an addition and remodel to McGill Hall at the University of Montana for use by the Montana Center for Work Physiology and Exercise Metabolism (WPEM). The remodel is 1,270 sf and the 2-story addition is 6,040 sf and is located along the south side of the existing building. Bids over $150,000 must be accompanied by a bid security meeting the requirements of the State of Montana in the amount of 10% of the total bid. After award, the successful bidder must furnish an approved Performance Security Bond and a Labor & Material Payment Security Bond each in the amount of 100% of the contract.

Post-Bid

$7,000,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
0
Bidding Soon
129
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.