BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 9, 2026 at 8:00 PM

Updated July 15, 2026

Site work, paving and renovation of a civil project in Bettendorf, Iowa. Completed plans call for the renovation of a road / highway; water / sewer project; for site work for a road / highway; water / sewer project; for paving for a road / highway; and water / sewer project.

The proposed improvements consist of rehabilitating one (1) alley segment totaling approximately 900 linear feet. The alleys vary in width from ten (10) feet to fourteen (14) feet. The proposed improvements consist of milling the existing surface, placement of granular subbase and resurfacing with Hot Mix Asphalt (HMA). The program also includes partial construction of driveways, storm sewer, storm sewer intakes, sodding, and other work related to reconstruct the alleys. The bidder to whom the Contract is awarded shall commence work no later than the date to begin work set forth in a Notice to Proceed from the City or its authorized representative, to the Contractor. All work shall be done in strict compliance with the plans and specifications prepared by the Engineer of the Engineering Division of the Public Works Department of Bettendorf, Iowa. Rehabilitation of two alley segments including milling existing surface, placement of granular subbase, resurfacing with Hot Mix Asphalt, partial construction of driveways, storm sewer, storm sewer intakes, and sodding. Bonds: Certified Check required, 10% Bid Bond, 100% Performance Bond, 100% Maintenance Bond. Question Cut Off Date: 7/1/2026 12:00:00 PM (CT)

Bid Results

Roads / Highways

$662,633.00

Public - City

Paving, Renovation, Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
2
Bidding Soon
1,448
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2026

July 13, 2026

Project location map

28th 1/2 St, Bettendorf, IA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.