Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 28, 2026 at 8:00 PM

Updated November 3, 2026

Site work for a civil project in Fountain Valley, California. Conceptual plans call for site work for a water / sewer project.

The Solids Deep Well Injection System (SDWIS) at OC SAN's Plant No. 1 is a multiphase capital project requiring design, permitting, construction, testing, and commissioning of a new long term solids management facility. The Project includes: o Development of a full-scale deep well injection facility to potentially manage the average daily production of solids from Plant No. 1 (approximately 520 gallons per minute of digested sludge at 3-4% density) as well as flexibility for future Plant No. 2 flows (approximately 375 gallons per minute). o Permitting, design, construction and testing of an initial test well facility, delivered under a separate early GMP, to confirm injection feasibility and formation performance. o Full buildout of surface and subsurface facilities, supporting utilities, and operational systems that are integrateable with OC SAN's existing infrastructure and treatment processes. o Preparation of permitting documents (EPA UIC, SCAQMD, local permits, etc). o Facility commissioning along with a two-year extended performance acceptance test commissioning time period. The scale of the Project spans subsurface drilling, major civil and mechanical facility construction, wastewater solids handling systems, odor control, electrical infrastructure expansion, and multi-agency regulatory coordination. Question Deadline 07/23/2026 at 5:00 PM PT Any questions regarding the RFP must be sent via e-mail to professionalservices@ocsan.gov to the attention of Ludwig Lapus, Principal Contracts Administrator. The project is included in the County 2027-2031 Capital Improvement Program (CIP). As of October 29,2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

$13,827,388.00

Public - County

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
749
Active Projects
263
Bidding Soon
4,704
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2030

Project location map

10844 Ellis Ave, Fountain Valley, CA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed