Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 29, 2026 at 8:00 PM
Updated July 8, 2026
Site work and new construction of a civil project in Long Beach, California. Completed plans call for the construction of a water / sewer project; water / sewer project; water / sewer project; for site work for a water / sewer project; water / sewer project; and water / sewer project.
Planning and feasibility evaluation for the Groundwater Resilience Program, including planning for construction of a new groundwater treatment plant, production wells, and associated pipeline infrastructure. Request the pre-proposal meeting information by sending an e-mail to Ms. Leela Stevens at Leela.Stevens@lbutilities.org and include the subject line "Groundwater Resilience Program Feasibility Study (EO-3791): RSVP to Pre-Proposal Meeting". Please include the names and email addresses of all personnel that will be attending the online meeting. PROJECT SCHEDULE LBUD expects the engineering services for this Project to be completed promptly. The Consultant shall have 12 months to complete the Project following the Notice to Proceed. IV. TASK DESCRIPTION TASK A: NON-OPTIONAL WORK 1. Project Management, Communication and Meetings 1.1 Assign a project manager that will be the point of contact and coordinate all communication with LBUD staff. 1.2 At the commencement of the Project, the Consultant shall hold a kick-off meeting with LBUD staff and sub-Consultants to discuss the scope and parameters of the Project as well as LBUD's experience with the existing water facilities. Specific goals to be accomplished will be identified and effective strategy to accomplish the project goals will be discussed during this meeting. Consultant shall prepare and distribute the agenda at least 3 working days prior to the meeting, and prepare and distribute meeting minutes within 5 working days of meeting. 1.3 Prepare a work plan to document the established project goals, milestones and deliverables, and include a project execution strategy. Presentation and review of the work plan will be done at the kick-off meeting. This work plan will serve as the basis for subsequent action, in accordance with this Scope of Work. 1.4 Following the kick-off meeting, the Consultant shall anticipate a series of workshops as identified in this RFP and bi-weekly progress meetings with LBUD staff for the duration of the Project. Consultant will prepare and distribute agendas at least 3 days prior to the meeting, lead the meetings, and prepare and distribute meeting minutes within 5 working days of meeting. 1.5 The Consultant shall address any constraints or problems envisioned for the Project. The Consultant shall use sound engineering criteria in the development and administration of the Project. The Consultant shall also be responsible for the accuracy of the calculations performed on the Project. Questions shall be submitted to Ms. Leela Stevens at Leela.Stevens@lbutilities.org no later than 4:00PM Pacific Standard Time on Wednesday, July 8, 2026. Responses to the questions will be posted on Long Beach Buys under the RFP title
GC Bidding
$3,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Multiple Locations, Long Beach, CA
Related To This Project
Long Beach, CA
--
Long Beach, CA
--
Long Beach, CA
--
Long Beach, CA
--
Long Beach, CA
--
Long Beach, CA
--
Long Beach, CA
--
Long Beach, CA
--
Long Beach, CA
Bid Date: Jul 15 2026
Long Beach, CA
Bid Date: Jun 20 2026
Long Beach, CA
--
Long Beach, CA
Bid Date: Jun 18 2026
Long Beach, CA
Bid Date: Jun 23 2026
Long Beach, CA
Bid Date: Jun 24 2026
Long Beach, CA
Bid Date: Oct 31 2018
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
