BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 25, 2026 at 8:00 PM

Updated July 8, 2026

Site work, renovation and addition to an educational facility in Comer, Georgia. Completed plans call for the addition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

It is the intention of Madison County Schools to contract with a vendor(s) to provide a high quality, cost- effective structured cabling system for this project. Please refer to EXHIBIT A (separate document) for drop and MDF locations. Included in this project are 68 access point drops, 61 camera drops, and 88 data drops, 26 intercom drops, 18 clock drops, 7 outdoor horn drops, 9 door access control drops, 4 Centegix system drops for 281 total. All questions must be received no later than 12:00 PM EST on July 10, 2026. Deadline for addendum posting by MCSS July 14, 2026 All questions concerning this RFP must be submitted in writing, email Amy Denman P.O. Box 37, Danielsville, GA 30633 Email: adenman@madison.k12.ga.us Madison County School System reserves the right to refuse consideration of any late or incomplete responses to this RFP. SCOPE OF WORK It is the intention of Madison County Schools to contract with a vendor(s) to provide a high quality, cost- effective structured cabling system for this project. Please refer to EXHIBIT A (separate document) for drop and MDF locations. Included in this project are 68 access point drops, 61 camera drops, and 88 data drops, 26 intercom drops, 18 clock drops, 7 outdoor horn drops, 9 door access control drops, 4 Centegix system drops for 281 total. It is very important to note that there are two phases to this project. Phase 1 is the addition of a cafeteria and 6 new classrooms. Phase 1 has already started and low voltage work could begin as early as July of 2026. Phase 2 is the renovation of existing spaces at Comer Elementary School including the office and old cafeteria. Phase 2 will begin in May of 2027 and must be completed by the end of July, 2027. PROJECT DESCRIPTION Vendors will be required to submit responses for complete packages of this RFP. Once award(s) has been made, the Technology Director or a designee will work directly with the vendor schedule implementation. Madison County School System will make every effort to coordinate the projects with vendor(s) to minimize costs to the school system.

GC Bidding

$2,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
299
Active Projects
31
Bidding Soon
1,803
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

565 Gholston St, Comer, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.