BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 22, 2026 at 8:00 PM

Updated July 7, 2026

Site work for a power facility in Nashville, Tennessee. Conceptual plans call for site work for a power facility.

Furnishing all labor, tools, materials, and Eaton-approved test equipment necessary to refurbish and deliver three Eaton 150VCP-WG-50-3000A Vacuum Circuit Breakers (VCB), government property. The work includes refurbishment based on Eaton's evaluation and recommendations, ensuring the breakers are compatible with existing USACE switchgear, and returning one refurbished VCB each to Cordell Hull Power Plant, Wolf Creek Power Plant, and Old Hickory Power Plant. The contractor is responsible for all plant, labor, and materials required to complete the refurbishment and delivery of the units. The Method of Contractor Selection has not been determined at this Time.

Conceptual

$1,400,000.00

Public - Federal

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
7
Bidding Soon
1,293
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

Multiple Locations, Nashville, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.